NUREG 0933
Displaying 1 - 25 of 76
TASK I.A.1: OPERATING PERSONNEL AND STAFFING Complex transients in nuclear power plants place high demands on the operators in the control room. The objective of the actions described in this task was to increase the capability of the shift crews in the …
1
The objectives of this task were to: (1) improve the capability of operators and supervisors to understand and control complex reactor transients and accidents; (2) improve the general capability of an operations organization to respond rapidly and …
1
The objectives of this task were to: (1) upgrade the requirements and procedures for nuclear power plants operator and supervisor licensing to assure that safe and competent operators and senior operators are I charge of the day-to-day operation of …
1
The objectives of this task were to: (1) establish and sustain a high level of realism in the training and retraining of operators, including dealing with complex transients involving multiple permutations and combinations of failures and errors; and (2) …
1
The objectives of this task were to: (1) Improve licensee safety performance and ability to respond to accidents by upgrading the licensee groups responsible for radiation protection and plant operation in such areas as staff size; education and …
1
The objective of this task was to improve the quality of procedures to provide greater assurance that operator and staff actions were technically correct, explicit, and easily understood for normal, transient, and accident conditions. The overall content, …
1
The objective of this task was to improve the ability of nuclear power plant control room operators to prevent accidents or cope with accidents if they occur by improving the information provided to them. ITEM I.D.1: CONTROL ROOM DESIGN REVIEWS This item …
1
The objective of this task was to improve the quality assurance program (QA) for design, construction, and operations to provide greater assurance that plant design, construction, and operational activities were conducted in a manner commensurate with …
1
The objectives of this task were to: (1) increase the capability of shift crews to operate facilities in a safe and competent manner by assuring that training for plant changes and off-normal events was conducted; and (2) review the comprehensiveness of …
1
The objective of this task was to enhance public safety and reduce individual and societal risk by developing and implementing a phased program to include, in safety reviews, consideration of core degradation and melting beyond the design basis. ITEM …
1
The objective of this task was to improve the reliability and capability of nuclear power plant systems for removing decay heat and achieving safe shutdown conditions following transients and under post-accident conditions. ITEM II.E.3.1: RELIABILITY OF …
1
TASK II.J.1: VENDOR INSPECTION PROGRAM The objective of this task was to improve vendor-supplied components and services through a modified and more effective vendor inspection program. ITEM II.J.1.1: ESTABLISH A PRIORITY SYSTEM FOR CONDUCTING VENDOR …
1
The objective of this task was to improve the qualification of licensees for operating nuclear power plants by requiring greater oversight of design, construction, and modification activities. ITEM II.J.3.1: ORGANIZATION AND STAFFING TO OVERSEE DESIGN AND …
1
The objective of this task was to clarify deficiency report requirements to obtain uniform reporting and earlier identification and correction of problems. ITEM II.J.4.1: REVISE DEFICIENCY REPORTING REQUIREMENTS DESCRIPTION This TMI Action Plan [1] item …
1
The objectives of this task were to perform systems reliability analyses and to effect changes in emergency operating procedures and operator training to improve the capability of plants to mitigate the consequences of the small-break LOCAs and …
1
TASK III.D.1: RADIATION SOURCE CONTROL The objective of this task is to perform evaluations to establish additional design features that should be included in the rulemaking proceeding of Item II.B.8. The purpose of these evaluations is to identify design …
1
The objective of this task was to improve public radiation protection in the event of a nuclear power plant accident by improving (1) radioactive effluent monitoring, (2) the dose analysis for accidental releases of radioiodine, tritium, and carbon-14, …
1
The objective of this task is to improve nuclear power plant worker radiation protection to allow workers to take effective action to control the course and consequences of an accident, as well as to keep exposures as low as reasonably achievable (ALARA) …
1
The objectives of this task are: (1) to improve and expand the NRC training program for the technical staff and resident inspectors, including, where appropriate, hands-on training; and (2) to establish a program to provide technically qualified …
1
The objective of this task is to respond to the President's request for NRC participation in the Radiation Policy Council. ITEM IV.H.1: NRC PARTICIPATION IN THE RADIATION POLICY COUNCIL DESCRIPTION The Radiation Policy Council, a policy coordinating body …
1
DESCRIPTION Historical Background Operation of a LWR results in slow corrosion of the interior metal surfaces of the primary coolant system. The resulting corrosion products circulate through the reactor core and are activated by neutron flux from the …
1
DESCRIPTION At the time this issue was identified in NUREG-0371, [1] compliance with NEPA required that alternatives to a proposed Federal action be considered, and that required alternatives be balanced against the base case in terms of their associated …
1
DESCRIPTION This NUREG-0471 [1] task will develop more reliable models and associated computer capability than currently available to the staff for assessing the radiological consequences of accidents that could result in the releases of radioactivity …
1
DESCRIPTION Historical Background This NUREG-0471 [1] item involved the development of a time criterion for safety-related operator actions (SROA), including a determination of whether or not automatic actuation was to be required. At the time this issue …
1
DESCRIPTION This NUREG-0471 [1] task involves the maintenance and improvement of calculational capabilities for assessing doses to individuals from radiation and radioactive effluents from normal operation and from radioactive releases from postulated …
1
Page Last Reviewed/Updated 3/1/2026
Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.