NUREG 0933
Displaying 1 - 6 of 6
DESCRIPTION Historical Background This issue is identified in Appendix D of NUREG-0572 [1] and is one of the key observations made after the ACRS requested its members and consultants to make comprehensive reviews of all Licensee Event Reports (LERs) …
1
DESCRIPTION Historical Background The containment flooding issue stems from a flooding event that occurred at the Indian Point 2 reactor in October 1980. [1] A large quantity of water leaked from fan coolers onto the containment building floor and …
1
DESCRIPTION Historical Background On November 11, 1981, the DAILY REPORT-REGION I carried a "prompt report" from Calvert Cliffs Units 1 and 2 indicating the licensee had been notified that the water tight integrity of the service water pump rooms in both …
1
DESCRIPTION Historical Background The issue of using the most recent NOAA procedures for determining probable maximum precipitation (PMP) was raised [1] after an OL applicant disputed the NRC use of NOAA Hydrometeorological Report (HMR) Nos. 51 [2] and …
1
DESCRIPTION The issue, as originally proposed, [1] addressed the concern for fission product removal by the containment sprays and suppression pools in PWRs and BWRs, respectively; however, it was expanded to include PWR plants that use ice condenser …
1
DESCRIPTION Historical Background This issue was identified [1] by NRR as a result of a diagnostic evaluation team inspection of the SWS at Zion, a multiplant site. The inspection identified the potential for some additional shared systems to have an …
1
Page Last Reviewed/Updated 3/1/2026
Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.