Skip to main content
A new keyword search will reset all filters below. You can further limit keyword search results with tags.
Image

NUREG 0933

Displaying 201 - 211 of 211

DESCRIPTION Historical Background This issue was identified [1] by NRR following an allegation that was submitted to the NRC in March 2006 that described a scenario in which a SBLOCA event in a PWR has progressed to the sump recirculation mode of core …
DESCRIPTION Historical Background Spent fuel pools (SFPs) at PWRs are Seismic Category I structures that contain borated water, maintain spent fuel temperatures, and provide radiation shielding. The SFPs are typically lined with stainless steel plates, …
DESCRIPTION This issue was identified by an NMSS engineer in December 2006 and addressed concerns about potential safety issues with cranes that are used to lift spent fuel casks at nuclear power plants. The areas of concern involved questions about the …
Note: Due to the sensitive nature of some information in this analysis, redactions are necessary in this public version. The Nuclear Regulatory Commission (NRC) has coordinated with other Federal agencies (Department of Homeland Security, Federal Energy …
The following is an excerpt from Appendix VI, Section 2 of WASH-1400 (NUREG-75/104), "Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants," dated October 1975. On this page:       Section 2 Releases from …
The table below identifies those generic issues (GIs) that have resulted in a regulatory product: hence, they may be applicable to operating and future nuclear power plants. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) …
TABLE 1 RISK THRESHOLDS   (a) The priority rank is always HIGH when any of the following risk (or risk related) thresholds are estimated to be exceeded (or when extraordinary uncertainty suggests that they may well be exceeded):   (1) 11000 person-rem …
This appendix documents those activities related to generic issues, i.e., related generic activities (RGA) that did not meet the criteria for designation as generic issues (GI) but were important enough to require the development of Action Plans by NRR to …
This appendix documents those generic communication and compliance activities (GCCA) completed by NRR that did not meet the criteria for designation as generic issues (GI), but were important enough to require the issuance of Information Notices (IN) …
This appendix documents those non-reactor GSIs identified, prioritized, and resolved by NMSS. As stated in SECY-98-001, [1] the prioritization procedure for these issues is contained in NMSS Policy and Procedures Letter 1-57, [2] "NMSS Generic Issues …
BACKGROUND I.  History On October 8, 1976, the Commission directed the staff to develop "a program plan for resolution of generic issues (GIs) and completion of technical projects." The Commission further requested that "this plan should include: task …

Page Last Reviewed/Updated 3/1/2026

Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.