NUREG 0933

Displaying 1 - 10 of 10

DESCRIPTION The issue was raised after the occurrence of various incidents of water hammer that involved steam generator feedrings and piping, emergency core cooling systems, RHR systems, containment spray, service water, feedwater, and steam lines. The …
DESCRIPTION Historical Background Prior to May 1978, tests conducted by GE showed that the presence of steam and/or increased pressure in and above the upper core region of BWRs could adversely affect the distribution of flow from certain types of core …
DESCRIPTION Numerical reliability goals and methods of analysis have not been established by the NRC. The current basis for plant licensing continues to be NRC regulations which require, among other things, that the consequences of a LOCA be suitably …
DESCRIPTION Historical Background This NUREG-0471 [1] item concerned staff positions [2] BTP EISCB 18 and BTP RSB 6-11 which required physical locking out of electrical sources to specific MOVs in the ECCS. The existing staff positions established the …
DESCRIPTION A number of applicants for operating licenses have been performing sump tests to demonstrate ECCS operability during the recirculation phase following a postulated loss-of-coolant accident. These tests have shown that vortex formation is not …
DESCRIPTION Most vendors, in the conduct of internal audits of emergency core cooling performance computer codes, discovered errors in coding and/or logic which had significant effects on the prediction results of approved models. This NUREG-0471 [1] task …
DESCRIPTION Historical Background This issue was identified in NUREG-0471 [1] and addressed the establishment of surveillance test intervals and allowable equipment outage periods, using analytically-based TS criteria and methods. At the time the issue …
DESCRIPTION Following a plant transient or accident, provisions are required for long-term decay heat removal. Redundancy of components is required as necessary to assure that a failure in the RHR system will not impair the ability to maintain the plant …
DESCRIPTION Historical Background As identified in NUREG-0471, [1] Appendix K of 10 CFR 50 specifies the requirements for LWR ECCS analysis. These requirements call for specific conservatisms to be applied to certain models and correlations used in the …
DESCRIPTION This issue was documented in NUREG-0471 [1] and stemmed from an ACRS recommendation that the staff explore diverse means of obtaining ECCS capability for future plants. The ACRS also recommended the staff explore the issue in the context of …