Skip to main content

NUREG 0933

Displaying 1 - 5 of 5

The objective of this task was to demonstrate by testing and analysis that the relief and safety valves, block valves, and associated piping in the reactor coolant system (RCS) were qualified for the full range of operating and accident conditions; …
The objectives of this task were to: (1) decrease reliance on the emergency core cooling system (ECCS) for events other than LOCAs; (2) ensure that the ECCS design basis reliability and performance were consistent with operational experience; (3) reach a …
The objective of this task was to evaluate whether existing requirements for valve testing provided adequate assurance of performance under design conditions. ITEM II.E.6.1: TEST ADEQUACY STUDY DESCRIPTION Historical Background The purpose of this TMI …
The objective of this task was to increase the reliability and diversification of the electrical power supplies for certain safety-related equipment. ITEM II.G.1: POWER SUPPLIES FOR PRESSURIZER RELIEF VALVES, BLOCK VALVES, AND LEVEL INDICATORS DESCRIPTION …
The objectives of this task were to perform systems reliability analyses and to effect changes in emergency operating procedures and operator training to improve the capability of plants to mitigate the consequences of the small-break LOCAs and …

Page Last Reviewed/Updated 3/1/2026

Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.