NUREG 0933
Applied Filters
Displaying 1 - 25 of 330
The U.S. Nuclear Regulatory Commission (NRC), through its assessment of plant operations, identifies potentially significant issues involving public health and safety, the common defense and security, or the environment that could affect multiple entities …
1
This section contains the appendices relevant to NUREG-0933. Appendix A of NUREG-0933 is an excerpt from Appendix VI, Section 2 of WASH-1400 (NUREG-75/104), "Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants," …
1
Beginning with Supplement 35, NUREG-0933 went exclusively on-line. Previous supplements were available in hard copy. This table lists, in reverse chronological order by year and supplement, a brief description of revisions since supplement 34. Year and …
1
TASK I.A.1: OPERATING PERSONNEL AND STAFFING Complex transients in nuclear power plants place high demands on the operators in the control room. The objective of the actions described in this task was to increase the capability of the shift crews in the …
1
The objectives of this task were to: (1) improve the capability of operators and supervisors to understand and control complex reactor transients and accidents; (2) improve the general capability of an operations organization to respond rapidly and …
1
The objectives of this task were to: (1) upgrade the requirements and procedures for nuclear power plants operator and supervisor licensing to assure that safe and competent operators and senior operators are I charge of the day-to-day operation of …
1
The objectives of this task were to: (1) establish and sustain a high level of realism in the training and retraining of operators, including dealing with complex transients involving multiple permutations and combinations of failures and errors; and (2) …
1
The objectives of this task were to: (1) Improve licensee safety performance and ability to respond to accidents by upgrading the licensee groups responsible for radiation protection and plant operation in such areas as staff size; education and …
1
The objective of this task was to improve the safety of operations at nuclear power plants by increasing the effectiveness of the NRC inspection program as follows: (1) revise the existing inspection program; (2) implement the resident inspection program; …
1
The objective of this task was to improve the quality of procedures to provide greater assurance that operator and staff actions were technically correct, explicit, and easily understood for normal, transient, and accident conditions. The overall content, …
1
The objective of this task was to improve the ability of nuclear power plant control room operators to prevent accidents or cope with accidents if they occur by improving the information provided to them. ITEM I.D.1: CONTROL ROOM DESIGN REVIEWS This item …
1
The objective of this task was to establish an integrated program which involved participation by the licensees, vendors, NSAC, INPO, and the NRC, and which included foreign operations experience for the systematic collection, review, analysis, and …
1
The objective of this task was to improve the quality assurance program (QA) for design, construction, and operations to provide greater assurance that plant design, construction, and operational activities were conducted in a manner commensurate with …
1
The objectives of this task were to: (1) increase the capability of shift crews to operate facilities in a safe and competent manner by assuring that training for plant changes and off-normal events was conducted; and (2) review the comprehensiveness of …
1
The objective of this task was to provide an added contribution to safety through the development of siting criteria for new power plants and the reevaluation with regard to the new siting criteria of facilities either under construction or operating. …
1
The objective of this task was to enhance public safety and reduce individual and societal risk by developing and implementing a phased program to include, in safety reviews, consideration of core degradation and melting beyond the design basis. ITEM …
1
The objective of this task was to develop and implement improved systems-oriented approaches to safety review. The NRC was to employ risk assessment methods to identify particularly high-risk accident sequences at individual plants and determine …
1
The objective of this task was to demonstrate by testing and analysis that the relief and safety valves, block valves, and associated piping in the reactor coolant system (RCS) were qualified for the full range of operating and accident conditions; …
1
The objectives of this task were to: (1) decrease reliance on the emergency core cooling system (ECCS) for events other than LOCAs; (2) ensure that the ECCS design basis reliability and performance were consistent with operational experience; (3) reach a …
1
The objective of this task was to improve the reliability and capability of nuclear power plant containment structures to reduce the radiological consequences and risk to the public from design basis events and degraded-core and core-melt accidents. ITEM …
1
The objective of this task was to evaluate whether existing requirements for valve testing provided adequate assurance of performance under design conditions. ITEM II.E.6.1: TEST ADEQUACY STUDY DESCRIPTION Historical Background The purpose of this TMI …
1
The objective of this task was to provide instrumentation to monitor plant variables and systems during and following an accident. Indications of plant variables and status of systems important to safety are required by the plant operator (licensee) …
1
TASK II.J.1: VENDOR INSPECTION PROGRAM The objective of this task was to improve vendor-supplied components and services through a modified and more effective vendor inspection program. ITEM II.J.1.1: ESTABLISH A PRIORITY SYSTEM FOR CONDUCTING VENDOR …
1
The objective of this task was to clarify deficiency report requirements to obtain uniform reporting and earlier identification and correction of problems. ITEM II.J.4.1: REVISE DEFICIENCY REPORTING REQUIREMENTS DESCRIPTION This TMI Action Plan [1] item …
1
The objectives of this task were to perform systems reliability analyses and to effect changes in emergency operating procedures and operator training to improve the capability of plants to mitigate the consequences of the small-break LOCAs and …
1