DESCRIPTION Historical Background This issue was identified at an NRC Operating Reactor Events meeting on January 7, 1982, [1] and addressed fire protection system (FPS) actuations that resulted in adverse interactions with safety-related equipment at …
DESCRIPTION Historical Background Issue B-63, which was resolved and implemented as MPA B-45, required leak-testing of the check valves that isolate those low pressure systems that are connected to the RCS outside the containment. However, except for …
Issue Identification The NRC identified [1] this issue in June 1992 to address an NRC staff members concern, given in a DPO dated December 3, 1991, [2] and modified March 27, 1992, [3] about the potential for a main steamline break (MSLB) accident to …