DISCUSSION On May 7, 1975, the NRC was informed by VEPCO that an asymmetric loading on the reactor vessel supports resulting from a postulated reactor coolant pipe rupture at a specific location (e.g., the vessel nozzle) had not been considered by W or …
DESCRIPTION Because of the remote possibility of failure of nuclear reactor pressure vessels designed to the ASME Boiler and Pressure Vessel Code, the design of nuclear facilities does not provide protection against reactor vessel failure. Prevention of …
DESCRIPTION Historical Background As a result of the loss of high head injection capability at McGuire Unit 1 on February 12, 1982, this issue was raised by Region II because plant TS require (somewhat rapid) plant shutdown if certain safety equipment is …
Historical Background The purpose of the Maintenance and Surveillance Program (MSP) effort is to provide direction for the NRC's efforts to assure effective nuclear power plant maintenance. The program will be based on the current NRC regulatory approach …

Page Last Reviewed/Updated 3/1/2026

Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.