NUREG 0933

Displaying 1 - 15 of 15

DESCRIPTION The issue was raised after the occurrence of various incidents of water hammer that involved steam generator feedrings and piping, emergency core cooling systems, RHR systems, containment spray, service water, feedwater, and steam lines. The …
DESCRIPTION Historical Background This issue is identified in Appendix D of NUREG-0572 [1] and is one of the key observations made after the ACRS requested its members and consultants to make comprehensive reviews of all LERs issued during the years 1976, …
DESCRIPTION Historical Background On June 19, 1981, AEOD issued a preliminary report [1] on the incident at Calvert Cliffs Unit 1 in which the plant lost both redundant trains of service water when the service water system became air-bound as a result of …
DESCRIPTION Historical Background On April 3, 1981, AEOD published draft NUREG-0785, "Safety Concerns Associated with Pipe Breaks in the BWR Scram System." [1] As a result of the development of these safety concerns and the findings presented in the …
DESCRIPTION Historical Background Protection systems in nuclear power plants are required to meet the design criteria of IEEE-279, "Criteria for Protection Systems for Nuclear Power Generating Stations." [1] One of the criteria of IEEE-279 requires that …
DESCRIPTION Historical Background Following the steam generator tube rupture (SGTR) event at Ginna in January 1982, [1] the staff proceeded to develop generic steam generator requirements which would help mitigate or reduce steam generator tube …
DESCRIPTION Historical Background During the period 1978 to 1980, there were reports of fatigue failure of thermal sleeve assemblies in the piping systems of both PWRs and BWRs. The BWR problem was addressed by GE in NEDO-21821 and was resolved with a …
DESCRIPTION Historical Background This issue was identified [1] following a staff evaluation of allegations that improper consideration of "stiff" pipe clamps in Class 1 piping systems could result in unsafe plant operation. IE Information Notice No. …
DESCRIPTION Historical Background On August 12, 1983, one of the three emergency diesel generators (EDG) at the Shoreham Plant failed during overload testing as a result of a fractured crankshaft. The failure occurred in EDG-102 and similar crankshaft …
DESCRIPTION Historical Background BWRs are equipped with SRVs to control primary system pressurization. Upon SRV actuation and following the clearing of air from the discharge lines, essentially pure steam is injected into the pool. Experiments indicate …
DESCRIPTION Historical Background On January 27, 1985, a dented and leaking tendon grease cap was found during inspections at Farley Unit 2 prior to the integrated leak rate test of the prestressed concrete containment structure. Subsequent detailed …
DESCRIPTION In 1985, operating experience as well as staff and industry studies indicated that AFW systems continued to fail at a high rate. These studies also indicated that plants with similar AFW system reliabilities (as calculated in accordance with …
DESCRIPTION The TMI-2 Safety Advisory Board was established to provide the licensee, General Public Utilities Nuclear Corporation, with a qualified, independent appraisal of the cleanup of TMI-2, with particular emphasis on the assurance of public and …
One purpose of this task is to ensure that the licensing examination for reactor operators and senior operators is a valid measure of the operator's knowledge and ability to perform the necessary tasks and functions required to safely operate and control …
This task was developed to provide assurance that plant procedures were adequate and could be used effectively. The objective was to provide procedures that would guide operators in maintaining plants in a safe state under all operating conditions, …