NUREG 0933

Displaying 1 - 4 of 4

The objective of this task was to reduce the sensitivity of B&W plants to feedwater transients, with emphasis on the overcooling transients that had been observed at B&W operating plants. ITEM II.E.5.1: DESIGN EVALUATION DESCRIPTION Historical Background …
The objective of this task was to clarify deficiency report requirements to obtain uniform reporting and earlier identification and correction of problems. ITEM II.J.4.1: REVISE DEFICIENCY REPORTING REQUIREMENTS DESCRIPTION This TMI Action Plan [1] item …
The objective of this task was to upgrade the emergency preparedness of nuclear power plants. Specific criteria to meet this objective were delineated in NUREG-0654. [1] ITEM III.A.2.1: AMEND 10 CFR 50 AND 10 CFR 50, APPENDIX E The four parts of this item …
This task was developed to assure that the number and capabilities of the staff at nuclear power plants are adequate to provide safe operation. To meet this goal, consideration will be given to: (1) the numbers and functions of the staff needed to safely …

Page Last Reviewed/Updated 3/1/2026

Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.