The objective of this task was to reduce the sensitivity of B&W plants to feedwater transients, with emphasis on the overcooling transients that had been observed at B&W operating plants. ITEM II.E.5.1: DESIGN EVALUATION DESCRIPTION Historical Background …
1
The objective of this task was to clarify deficiency report requirements to obtain uniform reporting and earlier identification and correction of problems. ITEM II.J.4.1: REVISE DEFICIENCY REPORTING REQUIREMENTS DESCRIPTION This TMI Action Plan [1] item …
1
The objective of this task was to upgrade the emergency preparedness of nuclear power plants. Specific criteria to meet this objective were delineated in NUREG-0654. [1] ITEM III.A.2.1: AMEND 10 CFR 50 AND 10 CFR 50, APPENDIX E The four parts of this item …
1
DESCRIPTION Historical Background This issue is identified in Appendix D of NUREG-0572 [1] and is one of the key observations made after the ACRS requested its members and consultants to make comprehensive reviews of all LERs issued during the years 1976, …
1
DESCRIPTION This issue concerns the slow loss of control air pressure in the scram system of BWRs. [1] Air pressure dropping at a certain rate will first allow some of the CRD scram outlet valves to open slightly, thus filling the scram discharge volume …
1
DESCRIPTION Historical Background On June 28, 1980, during a routine shutdown of the Browns Ferry Unit 3 reactor, a manual scram from approximately 36% power failed to insert about 40% of the control rods. Two additional manual scrams followed by an …
1
DESCRIPTION Historical Background Protection systems in nuclear power plants are required to meet the design criteria of IEEE-279, "Criteria for Protection Systems for Nuclear Power Generating Stations." [1] One of the criteria of IEEE-279 requires that …
1
DESCRIPTION Historical Background Following the steam generator tube rupture (SGTR) event at Ginna in January 1982, [1] the staff proceeded to develop generic steam generator requirements which would help mitigate or reduce steam generator tube …
1
DESCRIPTION Historical Background On August 12, 1983, one of the three emergency diesel generators (EDG) at the Shoreham Plant failed during overload testing as a result of a fractured crankshaft. The failure occurred in EDG-102 and similar crankshaft …
1
DESCRIPTION Historical Background BWRs are equipped with SRVs to control primary system pressurization. Upon SRV actuation and following the clearing of air from the discharge lines, essentially pure steam is injected into the pool. Experiments indicate …
1
DESCRIPTION Historical Background At 6:53 a.m. on February 7, 1993, an intruder drove into the TMI site owner-controlled area, through a gate into the protected area of Unit 1, and crashed through a roll-up door on the turbine building. TMI security …
1
This task was developed to assure that the number and capabilities of the staff at nuclear power plants are adequate to provide safe operation. To meet this goal, consideration will be given to: (1) the numbers and functions of the staff needed to safely …