Chapters I, II, III, and IV presented a detailing of plans for NRC staff or licensee action whereas Chapter V addressed NRC policy, organization, and management and originally called for 17 specific actions to be taken by the Commissioners. In recognition of the interrelationships that required correlated planning, these 17 items were later grouped into seven subject areas by the staff and forwarded to the Commission in SECY-80-230B.[4] This revision to Chapter V was agreed upon by the Commission and was published as Rev. 1 to NUREG-0660[5] in July 1980. All items of Chapter V listed in this section follow the numbering system established in NUREG-0660,[6] Rev. 1.
[1] NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident," U.S. Nuclear Regulatory Commission, May 1980, (Rev. 1) August 1980.
[2] NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident," U.S. Nuclear Regulatory Commission, May 1980, (Rev. 1) August 1980.
[3] NUREG-0737, "Clarification of TMI Action Plan Requirements," U.S. Nuclear Regulatory Commission, November 1980, (Supplement 1) January 1983.
[4] SECY-80-230B, "Update of Chapter V of TMI Action Plan: NRC Policy, Organization, and Management," U.S. Nuclear Regulatory Commission, June 20, 1980. [8009160065]
[5] NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident," U.S. Nuclear Regulatory Commission, May 1980, (Rev. 1) August 1980.
[6] NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident," U.S. Nuclear Regulatory Commission, May 1980, (Rev. 1) August 1980.
- Task I.A: OPERATING PERSONNEL: Operating Personnel and Staffing: Shift Technical Advisor
- Task I.A.2: OPERATING PERSONNEL: Training and Qualifications of Operating Personnel: Immediate Upgrading of Operator and Senior Operator Training and Qualifications: Qualifications - Experience
- Task I.A.3: OPERATING PERSONNEL: Licensing and Requalification of Operating Personnel: Revise Scope of Criteria for Licensing Examinations
- Task I.A.4: OPERATING PERSONNEL: Initial Simulator Improvement: Short-Term Study of Training Simulators
- Task I.B: SUPPORT PERSONNEL: Management for Operations: Organization and Management Long-Term Improvements: Prepare Draft Criteria
- Task I.B.2: SUPPORT PERSONNEL: Inspection of Operating Reactors: Revise OIE Inspection Program: Verify the Adequacy of Management and Proced
- Task I.C: OPERATING PROCEDURES: Short-Term Accident Analysis and Procedures Revision: Small Break LOCAs
- Task I.D: CONTROL ROOM DESIGN: Control Room Design Reviews
- Task I.E: ANALYSIS AND DISSEMINATION OF OPERATING EXPERIENCE: Office for Analysis and Evaluation of Operational Data
- Task I.F: QUALITY ASSURANCE: Expand QA List
- Task I.G: PREOPERATIONAL AND LOW-POWER TESTING: Training Requirements
- Task II.A: SITING: Siting Policy Reformulation
- Task II.B: CONSIDERATION OF DEGRADED OR MELTED CORES IN SAFETY REVIEW: Plant Shielding to Provide Access to Vital Areas and Protect Safety Equipment for Post-Accident Operation
- Task II.C: RELIABILITY ENGINEERING AND RISK ASSESSMENT: Interim Reliability Evaluation Program
- Task II.D: REACTOR COOLANT SYSTEM RELIEF AND SAFETY VALVES: Testing Requirements
- Task II.E: SYSTEM DESIGN: Auxiliary Feedwater System: Auxiliary Feedwater System Evaluation
- Task II.E.2: SYSTEM DESIGN: Emergency Core Cooling System: Reliance on ECCS
- Task II.E.3: SYSTEM DESIGN: Decay Heat Removal: Reliability of Power Supplies for Natural Circulation
- Task II.E.4: SYSTEM DESIGN: Containment Design: Dedicated Penetrations
- Task II.E.5: SYSTEM DESIGN: Design Sensitivity of B&W Reactors: Design Evaluation
- Task II.E.6: SYSTEM DESIGN: In Situ Testing of Valves: Test Adequacy Study
- Task II.F: INSTRUMENTATION AND CONTROLS: Additional Accident Monitoring Instrumentation
- Task II.G: ELECTRICAL POWER: Power Supplies for Pressurizer Relief Valves, Block Valves, and Level Indicators
- Task II.H: TMI-2 CLEANUP AND EXAMINATION: Maintain Safety of TMI-2 and Minimize Environmental Impact
- Task II.J: GENERAL IMPLICATIONS OF TMI FOR DESIGN AND CONSTRUCTION ACTIVITIES: Vendor Inspection Program: Establish a Priority System for C
- Task II.J.2: GENERAL IMPLICATIONS OF TMI FOR DESIGN AND CONSTRUCTION ACTIVITIES: Construction Inspection Program: Reorient Construction Inspe
- Task II.J.3: GENERAL IMPLICATIONS OF TMI FOR DESIGN AND CONSTRUCTION ACTIVITIES: Construction Inspection Program: Assign Resident Inspectors to All Construction Sites
- Task II.J.4: GENERAL IMPLICATIONS OF TMI FOR DESIGN AND CONSTRUCTION ACTIVITIES: Revise Deficiency Reporting Requirements: Revise Deficiency Reporting Requirements
- Task II.K: MEASURES TO MITIGATE SMALL-BREAK LOSS-OF-COOLANT ACCIDENTS AND LOSS-OF-FEEDWATER ACCIDENTS: IE Bulletins: Review TMI-2 PNs and D
- Task III.A: EMERGENCY PREPAREDNESS AND RADIATION EFFECTS: Improve Licensee Emergency Preparedness - Short-Term: Upgrade Emergency Preparedness: Implement Action Plan Requirements for Promptly Improving Licensee Emergency Preparedness
- Task III.A.2: EMERGENCY PREPAREDNESS AND RADIATION EFFECTS: Improving Licensee Emergency Preparedness - Long-Term: Amend 10 CFR 50 and 10 CFR
- Task III.A.3: EMERGENCY PREPAREDNESS AND RADIATION EFFECTS: Improving NRC Emergency Preparedness: NRC Role in Responding to Nuclear Emergencie
- Task III.B: EMERGENCY PREPAREDNESS OF STATE AND LOCAL GOVERNMENTS: Transfer of Responsibilities to FEMA
- Task III.C: PUBLIC INFORMATION: Have Information Available for the News Media and the Public: Review Publicly Available Documents
- Task III.D: RADIATION PROTECTION: Radiation Source Control: Primary Coolant Sources Outside the Containment Structure: Review Information Su
- Task III.D.2: RADIATION PROTECTION: Public Radiation Protection Improvement: Radiological Monitoring of Effluents: Evaluate the Feasibility and Perform a Value-Impact Analysis of Modifying Effluent-Monitoring Design Criteria
- Task III.D.3: RADIATION PROTECTION: Worker Radiation Protection Improvement: Radiation Protection Plans
- Task IV.A: STRENGTHEN ENFORCEMENT PROCESS: Seek Legislative Authority
- Task IV.B: ISSUANCE OF INSTRUCTIONS AND INFORMATION TO LICENSEES: Revise Practices for Issuance of Instructions and Information to Licensees
- Task IV.C: EXTEND LESSONS LEARNED TO LICENSED ACTIVITIES OTHER THAN POWER REACTORS: Extend Lessons Learned from TMI to Other NRC Programs
- Task IV.D: NRC STAFF TRAINING: NRC Staff Training
- Task IV.E: SAFETY DECISION-MAKING: Expand Research on Quantification of Safety Decision-Making
- Task IV.F: FINANCIAL DISINCENTIVES TO SAFETY: Increased OIE Scrutiny of the Power-Ascension Test Program
- Task IV.G: IMPROVE SAFETY RULEMAKING PROCEDURES: Develop a Public Agenda for Rulemaking
- Task IV.H: NRC PARTICIPATION IN THE RADIATION POLICY COUNCIL: NRC Participation in the Radiation Policy Council
- Task V.A: DEVELOPMENT OF SAFETY POLICY: Develop NRC Policy Statement on Safety
- Task V.B: POSSIBLE ELIMINATION OF NONSAFETY RESPONSIBILITIES: Study and Recommend, as Appropriate, Elimination of Nonsafety Responsibiliti
- Task V.C: ADVISORY COMMITTEES: Strengthen the Role of Advisory Committee on Reactor Safeguards
- Task V.D: LICENSING PROCESS: Improve Public and Intervenor Participation in the Hearing Process
- Task V.E: LEGISLATIVE NEEDS: Study the Need for TMI-Related Legislation
- Task V.F: ORGANIZATION AND MANAGEMENT: Study NRC Top Management Structure and Process
- Task V.G: CONSOLIDATION OF NRC LOCATIONS: Achieve Single Location, Long-Term