Home
>
NRC Library
>
Document Collections
>
NUREG-Series Publications
>
Staff Reports
>
NUREG 0933
>
Section 3. New Generic Issues-
Issue 52: SSW Flow Blockage by Blue Mussels
Resolution of Generic Safety Issues: Issue 52: SSW Flow Blockage by Blue Mussels ( NUREG-0933, Main Report with Supplements 1–35 )
Search Generic Issues
Table of Contents
EXPORT AND PRINT
Open in New Window
DESCRIPTION
This issue was raised in an AEOD memorandum75 to NRR in May 1982 and addressed the problem of flow blockage by blue mussels (Mytilus Edilus) in the reactor building closed cooling water system at Pilgrim.
CONCLUSION
This issue has been combined and evaluated with Issue 51, "Proposed Requirements for Improving the Reliability of Open Cycle Service Water Systems."
REFERENCES
|