Event Notification Report for July 16, 2003

… Event Notification Report for July 16, 2003 … U.S. Nuclear Regulatory Commission Operations Center Event … 1 and 2, and is not required in the current MODE of | | plant operation (MODE 3). | | | | "The NRC Resident … | FACILITY: POINT BEACH REGION: 3 |NOTIFICATION DATE: 07/15/2003| | UNIT: [1] …

Event Notification Report for January 6, 2012

… Event Notification Report for January 6, 2012 … U.S. Nuclear Regulatory Commission Operations Center Event … Notified NRR EO (Ruland), R3DO (Valos), IRD (Morris), DHS (Beach), FEMA (Blankenship), DOE (Jackson), USDA (Timmons), … range while test leads were still in place across the test points. This action actuated the breaker closure relay, …

Event Notification Report for April 23, 2010

… Event Notification Report for April 23, 2010 … U.S. Nuclear Regulatory Commission Operations Center Event … returned to the company office for leak testing. At this point, there is no estimate of exposures to personnel at the … FLORIDA BUREAU OF RADIATION CONTROL Licensee: NORTH MIAMI BEACH SURGICAL Region: 1 City: NORTH MIAMI BEACH State: FL …

Event Notification Report for March 16, 2005

… Event Notification Report for March 16, 2005 … U.S. Nuclear Regulatory Commission Operations Center Event … Licensee: CONAM MMP INSPECTION INC Region: 4 City: LONG BEACH State: CA County: License #: 4832-19 Agreement: Y … electrical equipment rooms are assumed to increase to the point of causing multiple trains of both ESF and SS …

Event Notification Report for June 24, 2002

… Event Notification Report for June 24, 2002 … U.S. Nuclear Regulatory Commission Operations Center Event … | FACILITY: POINT BEACH REGION: 3 |NOTIFICATION DATE: 06/22/2002| | UNIT: [1] … of | | [the] scram has not been determined yet.. [The] Plant is stable and all | | parameters are being controlled. …

Power Reactor Status Report for September 15, 2007

… Hope Creek 1 97   COASTDOWN TO REFUELING OUTAGE     Indian Point 2 100         Indian Point 3 100         Limerick 1 … 1 0 09/07/2007 FORCED MAINTENANCE OUTAGE TO INSPECT NUCLEAR SERVICE WATER HEADER     Brunswick 2 100     *   … 0 09/09/2007 REFUELING OUTAGE *   Perry 1 100         Point Beach 1 100         Point Beach 2 100         Prairie Island …

Power Reactor Status Report for February 21, 2005

…         Ginna 100         Hope Creek 1 100         Indian Point 2 100         Indian Point 3 100         Limerick 1 20 …       Perry 1 92   COASTDOWN TO REFUELING OUTAGE     Point Beach 1 100         Point Beach 2 100         Prairie Island … Comment Change in report (*) Number of Scrams (#) Arkansas Nuclear 1 100         Arkansas Nuclear 2 100         …

Event Notification Report for September 24, 2013

… Event Notification Report for September 24, 2013 … U.S. Nuclear Regulatory Commission Operations Center Event … The affected facilities are: Oconee, Ginna, Crystal River, Point Beach, Monticello, Cook, and Turkey Point. Point of contact: …

Power Reactor Status Report for May 18, 2013

…   SCHEDULED DOWN POWER FOR TURBINE VALVE TESTING *   Indian Point 2 100   13.8 KV LINE 33332LM OOS     Indian Point 3 …   Perry 1 56   HOLDING FOR INCORE PHYSICS TESTING *   Point Beach 1 100         Point Beach 2 100         Prairie Island … Comment Change in report (*) Number of Scrams (#) Arkansas Nuclear 1 0 03/24/2013 REFUELING OUTAGE     Arkansas Nuclear

Power Reactor Status Report for May 24, 2013

… LEAK *   Ginna 100         Hope Creek 1 100         Indian Point 2 100   13.8 KV LINE 33332LM OOS     Indian Point 3 … SHUTDOWN; SEE EN #49002     Perry 1 100         Point Beach 1 100         Point Beach 2 100         Prairie Island … Comment Change in report (*) Number of Scrams (#) Arkansas Nuclear 1 0 03/24/2013 REFUELING OUTAGE     Arkansas Nuclear