Power Reactor Status Report for April 24, 2004

…     Browns Ferry 2 100         Browns Ferry 3 100         Brunswick 1 100         Brunswick 2 96   100% ELECTRICAL CAPABILITY     Catawba 1 100         Catawba 2 … Island 2 100         Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)     Quad Cities 2 85   LIMITED IN …

Power Reactor Status Report for November 2, 2004

…     Browns Ferry 2 100         Browns Ferry 3 100         Brunswick 1 100         Brunswick 2 96   100% ELECTRICAL CAPABILITY     Catawba 1 100         Catawba 2 … Island 2 100         Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)     Quad Cities 2 85   LIMITED IN …

Power Reactor Status Report for May 27, 2002

…     BROWNS FERRY 2 100         BROWNS FERRY 3 100         BRUNSWICK 1 100     *   BRUNSWICK 2 100         CATAWBA 1 … 2 100         BYRON 1 100         BYRON 2 100   MEASURED STEAM GENERATOR TUBE LEAKAGE = 14 GPD     CLINTON 1 91   … OUTAGE - FUEL SHUFFLE COMPLETE     DRESDEN 2 97   100% ELECTRICAL CAPABILITY     DRESDEN 3 91   INCREASING POWER * …

Power Reactor Status Report for July 7, 2003

… 3 96   Power Operation PRECONDITIONING TO FULL LOAD *   BRUNSWICK 1 93   Power Operation 100% ELECTRICAL CAPABILITY *   BRUNSWICK 2 96   Power Operation … 85   Power Operation HOLDING POWER FOR FURTHER ANALYSIS OF STEAM DRYER FOLLOWING REPAIRS     Region 4 Unit Power Down …

Power Reactor Status Report for July 5, 2003

…   Power Operation HOLDING POWER FOR FUEL CONDITIONING *   BRUNSWICK 1 93   Power Operation 100% ELECTRICAL CAPABILITY *   BRUNSWICK 2 96   Power Operation … 85   Power Operation HOLDING POWER FOR FURTHER ANALYSIS OF STEAM DRYER FOLLOWING REPAIRS     Region 4 Unit Power Down …

Power Reactor Status Report for December 21, 2002

… OUTAGE     NINE MILE POINT 2 0 12/20/2002 Hot Shutdown STEAM LEAK REPAIR ON MSR *   OYSTER CREEK 1 100         … TO REFUELING OUTAGE *   BROWNS FERRY 3 100         BRUNSWICK 1 94   Power Operation MAXIMUM POWER PRIOR TO …     BYRON 2 100         CLINTON 1 91   Power Operation 100% ELECTRICAL CAPABILITY     COOK 1 100         COOK 2 100     …

Power Reactor Status Report for August 31, 2008

… 100         Seabrook 1 100         Susquehanna 1 94   100% ELECTRICAL CAPABILITY     Susquehanna 2 100         Three … Browns Ferry 3 100   ONE COOLING TOWER TRANSFORMER OOS     Brunswick 1 100         Brunswick 2 0 08/30/2008 AUTOMATIC … 3 100         River Bend 1 100         San Onofre 2 99   STEAM GENERATOR PRESSURE LIMITATIONS - SWITCHYARD …

Power Reactor Status Report for December 1, 2008

… #5007 OUTAGE SCHEDULED FOR 12/1 THRU 12/19 - NO IMPACT ON ELECTRICAL REQUIREMENTS FOR SITE *   Peach Bottom 3 100   …   Browns Ferry 3 100   #1 COOLING TOWER TRANSFORMER OOS     Brunswick 1 89   HOLDING POWER FOR XENON - WILL PERFORM … 3 100         River Bend 1 100         San Onofre 2 96   STEAM GENERATOR LIMITATIONS TURBINE VALVE TESTING     San …

Power Reactor Status Report for April 20, 2002

…     BROWNS FERRY 2 100         BROWNS FERRY 3 100         BRUNSWICK 1 100         BRUNSWICK 2 0 04/19/2002 PLANNED … OUTAGE *   BYRON 1 100         BYRON 2 100   MEASURED STEAM GENERATOR TUBE LEAKAGE 2.54 GPD *   CLINTON 1 0 … 1 0 02/15/2002 REFUELING OUTAGE     DRESDEN 2 97   100% ELECTRICAL CAPABILITY     DRESDEN 3 100         DUANE ARNOLD …

Power Reactor Status Report for April 19, 2007

… SHUTDOWN DUE TO TRANSFORMER ISSUE; UNIT ON RHR COOLING; STEAM GENERATORS #33 AND 34 ISOLATED; EXPECT AUX FEED BACK … 35   SYNCHED AT 0614 ON 4/18 *   Browns Ferry 3 100         Brunswick 1 100         Brunswick 2 39   SYNCHED AT 1050 ON … 3 100         Turkey Point 4 100         Vogtle 1 98   100% ELECTRICAL CAPABILITY.     Vogtle 2 0 03/03/2007 REFUELING …