Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Search Results

Displaying 141 - 150 of 455

Event Notification Report for March 22, 2000

… | FACILITY: BRUNSWICK REGION: 2 |NOTIFICATION DATE: 03/19/2000| | UNIT: … | TURBINE TRIP - REACTOR TRIP | | | | An electrical fault on the main generator caused a turbine trip … was as expected. Decay heat is being removed by dumping steam | | to the main condenser. Auxiliary Feedwater started …

Event Notification Report for October 18, 1999

… | GREATER THAN 1% OF THE 'A' ONCE-THROUGH STEAM GENERATOR (OTSG) TUBES ARE | | DEFECTIVE. | | | | … | FACILITY: BRUNSWICK REGION: 2 |NOTIFICATION DATE: 10/16/1999| | UNIT: … GENERATORS ARE FULLY | | OPERABLE IF NEEDED, AND THEIR ELECTRICAL GRID IS STABLE. | | | | CURRENTLY, WIND DIRECTION …

Event Notification Report for September 12, 2017

… Arkansas Nuclear 1 Bruce Nuclear Power Development Brunswick Callaway Calvert Cliffs Clinton Columbia Cooper … Power Operation Event Text HIGH PRESSURE COOLANT INJECTION STEAM SUPPLY VALVE FAILED TO REPOSITION "At 0934 CDT, while … been informed." No safety systems are out of service. The electrical grid is stable but grid risk is high. Notified …

Event Notification Report for March 04, 2020

… Coolant System (RCS) temperature is being maintained by the steam dump system with all 4 Reactor Coolant Pumps (RCPs) in … temperature and normal operating pressure in Mode 3. The electrical system is in a normal alignment. "There was no … GEORGIA RADIOACTIVE MATERIAL PGM Licensee: GA PACIFIC - BRUNSWICK CELLUOSE LLC Region: 1 City: BRUNSWICK   State: GA …

Event Notification Report for July 3, 2006

… N Y 100 Power Operation 98 Power Operation Event Text MAIN STEAM ISOLATION VALVE STUCK DURING TESTING "[On June 30, … conditions for operation in effect. The safety related electrical buses are powered from offsite power and the grid … RECORDERS "On May 3, 2006, Progress Energy (CP&T) Brunswick Nuclear Plant notified Thermo Electron that, …

Power Reactor Status Report for July 8, 2003

…     BROWNS FERRY 2 100         BROWNS FERRY 3 100     *   BRUNSWICK 1 93   Power Operation 100% ELECTRICAL CAPABILITY     BRUNSWICK 2 96   Power Operation …       PRAIRIE ISLAND 1 99   Power Operation REDUCED POWER - STEAM FLOW CONCERN DUE TO STEAM GENERATOR TUBE PLUGGING *   …

Event Notification Report for November 2, 2006

… Inspector. Power Reactor Event Number: 42955 Facility: BRUNSWICK Region: 2 State: NC Unit: [ ] [2] [ ] RX Type: [1] … (EDGs) 3&4 autostarted and re-energized the affected electrical buses. At 1823 EST, an Unusual Event was declared … (SRV), and HPCI/RCIC in pressure control mode. The Main Steam Isolation Valves (MSIVs) (Group 1) and the drywell …

Event Notification Report for April 4, 2006

… RETRACTED !!!!! Power Reactor Event Number: 42305 Facility: BRUNSWICK Region: 2 State: NC Unit: [1] [ ] [ ] RX Type: [1] … the notification (Event Number 42305) made by the Brunswick Steam Electric Plant, Unit No. 1, Docket No. 50-325/License No. …

Event Notification Report for June 8, 2015

… Event Text PART 21 - INCORRECT PART NUMBER RELAY SHIPPED TO BRUNSWICK NUCLEAR PLANT The following is an excerpt of … Standby Event Text LOSS OF DECAY HEAT REMOVAL TO THE 'A' STEAM GENERATOR The following information was provided via … 51134 Rep Org: DIABLO CANYON Licensee: PACIFIC GAS & ELECTRIC CO. Region: 4 City: AVILA BEACH State: CA County: …