Event Notification Report for February 4, 2002

… | FACILITY: VOGTLE REGION: 2 |NOTIFICATION DATE: 02/02/2002| | UNIT: [1] … of a facsimile received from the licensee: | | | | "Vogtle Electric Generating Plant Unit 1 experienced an emergency start of | …

Event Notification Report for December 12, 2005

… a trip of the 10 Startup Bus Breaker occurred at Limerick Generating Station in the 220 KV substation. This … Inspector. Power Reactor Event Number: 42194 Facility: VOGTLE Region: 2 State: GA Unit: [ ] [2] [ ] RX Type: [1] … the steam dump valves to the condenser. All safety related electrical buses are available. Emergency diesel generators …

Event Notification Report for February 7, 2002

… !!!!!!! Power Reactor Event Number: 38666 - FACILITY: VOGTLE REGION: 2 NOTIFICATION DATE: 02/02/2002 UNIT: [1] [] … portion of a facsimile received from the licensee: "Vogtle Electric Generating Plant Unit 1 experienced an emergency start of …

Event Notification Report for December 8, 2016

… Notice: 16-027" Power Reactor Event Number: 52412 Facility: VOGTLE Region: 2 State: GA Unit: [3] [4] [ ] RX Type: [3] … to describe an invalid actuation of the Palo Verde Nuclear Generating Station (PVNGS) Unit 1 train A emergency diesel … pump. These components are portions of the emergency ac electrical power system, the emergency core cooling system, …

Event Notification Report for April 17, 2006

… to determine the cause of 11 Condensate Pump lockout. "Plant operations are underway per emergency procedure … Feedwater Pumps are maintaining Steam Generator level. The electrical grid is stable. The licensee will notify the NRC … R4DO (Pruett). Power Reactor Event Number: 42506 Facility: VOGTLE Region: 2 State: GA Unit: [1] [ ] [ ] RX Type: [1] …

Event Notification Report for April 24, 2007

… - I - 8402 Power Reactor Event Number: 43313 Facility: VOGTLE Region: 2 State: GA Unit: [ ] [2] [ ] RX Type: [1] … generator turbine trip. No visual damage is apparent on any plant equipment. "All systems responded as expected. Both … the condenser. The plant was placed in the normal shutdown electrical lineup. Power Reactor Event Number: 43315 …

Event Notification Report for August 14, 2007

… "At 2325 Central Daylight Time (CDT) on 8/12/2007, Callaway Plant received a trouble alarm for the Emergency Operations … revealed the EOF had lost one phase of incoming rural electric power which is believed to have been caused by a … Inspector. Power Reactor Event Number: 43564 Facility: VOGTLE Region: 2 State: GA Unit: [1] [2] [ ] RX Type: [1] …

Event Notification Report for March 9, 2010

… via facsimile: A breaker failed during operation at Plant Vogtle during operation. A failure analysis indicated … rods fully inserted. The plant is in a normal post-trip electrical line-up. Power Reactor Event Number: 45751

Event Notification Report for December 11, 2000

… and | | maintained steam generator water inventory. The plant is currently in mode | | 3 (hot standby) at normal … LIMITS | | ON 3 OF 30 CYLINDERS SHIPPED FROM WESTINGHOUSE ELECTRIC COMPANY IN COLUMBIA, | | SOUTH CAROLINA | | | | At … | FACILITY: VOGTLE REGION: 2 |NOTIFICATION DATE: 12/09/2000| | UNIT: [1] …

Event Notification Report for August 27, 2001

… | LOSS OF ELECTRICAL POWER TO THE TECHNICAL SUPPORT CENTER | | | | An … has determined that there is no safety impact related to plant | | applications. RNII does not feel Licensees with … | FACILITY: COLUMBIA GENERATING STATIREGION: 4 |NOTIFICATION DATE: 08/24/2001| | … | FACILITY: VOGTLE REGION: 2 |NOTIFICATION DATE: 08/25/2001| | UNIT: [1] …