Event Notification Report for February 4, 2002
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 02/01/2002 - 02/04/2002 ** EVENT NUMBERS ** 38666 +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38666 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: VOGTLE REGION: 2 |NOTIFICATION DATE: 02/02/2002| | UNIT: [1] [] [] STATE: GA |NOTIFICATION TIME: 04:47[EST]| | RXTYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 02/02/2002| +------------------------------------------------+EVENT TIME: 02:42[EST]| | NRC NOTIFIED BY: STEVE DOUGLAS |LAST UPDATE DATE: 02/02/2002| | HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |MIKE ERNSTES R2 | |10 CFR SECTION: | | |AESF 50.72(b)(3)(iv)(A) VALID SPECIF SYS ACTUAT| | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AUTOMATIC EMERGENCY DIESEL GENERATOR START FOR UNKNOWN REASONS | | | | The following text is a portion of a facsimile received from the licensee: | | | | "Vogtle Electric Generating Plant Unit 1 experienced an emergency start of | | the 1A emergency diesel generator at 0242 on 02/02/2002. The diesel | | generator emergency started without a safety injection or [loss of offsite | | power (LOSP)] signal present. Operators attempted to reset the emergency | | start signal without success. The diesel started and ran unloaded for | | approximately 1 hour and then was emergency stopped by control room | | operators and declared inoperable. An investigation for the cause for the | | start is underway at this time." | | | | The licensee stated that there were no maintenance or surveillance | | activities ongoing at the time of the event. The licensee also stated that | | there was no one present in the emergency diesel generator room at the time | | of the event. | | | | The licensee notified the NRC resident inspector. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021