Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Search Results

Displaying 1 - 10 of 65

Event Notification Report for June 11, 2014

… Inspector. Power Reactor Event Number: 50185 Facility: PEACH BOTTOM Region: 1 State: PA Unit: [2] [3] [ ] RX Type: [2] … as a result of natural causes occurred at the Peach Bottom Atomic Power Station. The fatality was not related to the …

Event Notification Report for April 14, 2003

… | FACILITY: PEACH BOTTOM REGION: 1 |NOTIFICATION DATE: 04/12/2003| | UNIT: [2] … INSERTED | | | | At 1847 hours on 04/12/03 the Peach Bottom Atomic Power Station Unit 2 | | experienced an automatic …

Event Notification Report for March 22, 2011

… R1DO (Rogge). Power Reactor Event Number: 46677 Facility: PEACH BOTTOM Region: 1 State: PA Unit: [2] [ ] [ ] RX Type: [2] … INOPERABLE "On 03/16/11, at 1647 [EST], Peach Bottom Atomic Power Station Unit 2 declared the High Pressure …

Event Notification Report for October 28, 2010

… 46368 46369 Power Reactor Event Number: 46353 Facility: PEACH BOTTOM Region: 1 State: PA Unit: [2] [3] [ ] RX Type: [2] … unloading operations and is located within the Peach Bottom Atomic Power Station Unit 3 containment building. …

Event Notification Report for August 9, 2011

… RETRACTED !!!!! Power Reactor Event Number: 46987 Facility: PEACH BOTTOM Region: 1 State: PA Unit: [ ] [3] [ ] RX Type: [2] … INJECTION "On 06/26/11, at 0030 [hrs. EDT], Peach Bottom Atomic Power Station Unit 3 declared the High Pressure …

Event Notification Report for January 10, 2017

… to the patient. Power Reactor Event Number: 52478 Facility: PEACH BOTTOM Region: 1 State: PA Unit: [2] [3] [ ] RX Type: [2] … effects of tornado generated missiles, Peach Bottom Atomic Power Station identified a non-conforming condition …

Event Notification Report for July 13, 2009

… 45196 45198 Power Reactor Event Number: 45193 Facility: PEACH BOTTOM Region: 1 State: PA Unit: [2] [3] [ ] RX Type: [2] … found in an on-site exploratory well at the Peach Bottom Atomic Power Station. The elevated levels of tritium were …

Event Notification Report for May 22, 2014

… TX # I-9193 Power Reactor Event Number: 50128 Facility: PEACH BOTTOM Region: 1 State: PA Unit: [2] [3] [ ] RX Type: [2] … using Shutdown Method 'D' as described in the Peach Bottom Atomic Power Station Fire Protection Program. Shutdown …

Event Notification Report for December 11, 2019

… informed." Part 21 Event Number: 54435 Rep Org: GENERAL ATOMICS Licensee: GENERAL ATOMICS ELECTROMAGNETIC SYSTEMS … The following plants are affected: FitzPatrick, Millstone, Peach Bottom, Pilgrim, Susquehanna, Catawba, McGuire, Saint Lucie, …

Event Notification Report for October 12, 2020

… 54943 54944   Power Reactor Event Number: 54917 Facility: Peach Bottom Region: 1     State: PA Unit: [2] [3] [] RX Type: [2] … are being performed on 09/28/20 to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) …