Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Search Results

Displaying 1 - 5 of 5

Morning Report for August 31, 2001

… PWR/W-3-LP,PWR/W-3-LP Tennessee Valley Authority Sequoyah 1 2 Soddy-Daisy,Tennessee Dockets: 50-327,50-328 … #3 and #1 emergency diesel generators (EDGs) at the Surry Nuclear Power Station and the 2B-B EDG at the Sequoyah … during April, July, and August 2001, respectively. Both plants employ General Motors/Electromotive Division (GM/EMD) …

Morning Report for December 13, 2000

… Line Break Barriers Dated December 11, 2000 The U.S. Nuclear Regulatory Commission issue this information notice … redundant safety-related equipment at D. C. Cook Nuclear Plant, Units 1 and 2. Technical contacts: S. D. Weerakkody, … Tennessee Valley Authority MR Number: H-00-0076 Sequoyah 2 Date: 12/13/00 Soddy-Daisy,Tennessee Dockets: …

Morning Report for May 20, 2004

… a manufacturer of steam generator tubes used in U. S. nuclear power plants, reported discovering damaged steam generator tubes … screws in the boxes was used for Palo Verde, Unit 2 and Sequoyah, Unit 1. Information for this issue as well as …

Morning Report for September 10, 2002

… valve to close. The vendor learned of this problem from the Sequoyah and Davis-Besse nuclear power plants. Contact: R. Caldwell, NRR 301-415-1243 E-mail: …

Morning Report for Macrh 13, 2000

… under its 10 CFR 50 Appendix B program, to several nuclear power plants. The vendor reports a potential defect in static … Oconee, Arkansas, Waterford, Crystal River, Diablo Canyon, Sequoyah, and Surry. In subsequent telephone calls with the …