Location: Two Rivers, WI (13 miles NNW of Manitowoc, WI); Region III; Type: Westinghouse Two-Loop; Licensed MWt: 1800
Location: Two Rivers, WI (13 miles NNW of Manitowoc, WI); Region III; Type: Westinghouse Two-Loop; Licensed MWt: 1677
As discussed at the April 2003 Agency Action Review Meeting (AARM), NRC staff decided to conduct its inspection, following Inspection Procedure 95003 (Issue Date: 01/17/02), "Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Mul...
Location: Two Rivers, WI (13 miles NNW of Manitowoc, WI) in Region III Operator: NextEra Energy Point Beach, LLCOperating License: Issued - 03/08/1973Renewed License: Issued - 12/22/2005License Expires: 03/08/2033Docket Number: 05000301Reactor Type: Pressurized Water Reac...
Location: Two Rivers, WI (13 miles NNW of Manitowoc, WI) in Region III Operator: NextEra Energy Point Beach, LLCOperating License: Issued - 10/05/1970Renewed License: Issued - 12/22/2005License Expires: 10/05/2030Docket Number: 05000266Reactor Type: Pressurized Water Reac...
NRC uses the Reactor Oversight Process (ROP) to assess plant performance within the three broad areas of (1) reactor safety, (2) radiation safety, and (3) security. Within these areas, NRC looks at seven cornerstones: (1) Initiating Events, (2) Mitigating Systems, (3) Barrier ...
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
801 WARRENVILLE ROAD
LISLE, ILLINOIS 60532-4351January 8, 1999EA 99-002Mr. M. Reddemann
Site Vice President
Point Beach Nuclear Plant
6610 Nuclear Road
Two Rivers, WI 54241SUBJECT:NOTICE OF ENFORCEMENT DISCRETION F...
The following table refers to NRC-approved power uprate applications. The table shows the ADAMS accession number for (1) each plant's power uprate application, (2) any supplement to the application, and (3) the license amendment approving the application and allowing the l...
April 28, 1999EA 99-002Mr. M. E. Reddemann
Site Vice President
Wisconsin Electric Power Company
Point Beach Nuclear Plant
6610 Nuclear Road
Two Rivers, WI 54241
SUBJECT: NOTICE OF VIOLATION (NRC SPECIAL INSPECTION
&n...
Human Factors Information System (HFIS)
U.S. Nuclear Regulatory Commission
From 01/01/2005 to 12/31/2005
Page 1 of 5
07/18/2006 09:26:20
2x National Average:
Total Number of Hits:
National Average:
IR/LER Category Analysis by Docket ReportDocument Types: IR, LER
Natio...
June 13, 2002EA-02-090Mr. M. Warner
Site Vice President
Kewaunee and Point Beach Nuclear Plants
Nuclear Management Company, Inc.
6610 Nuclear Road
Two Rivers, WI 54241SUBJECT: FINAL SIGNIFICANCE DETERMINATION FOR A WHITE FINDING AND NOTICE OF VIOLATION (NRC IN...
The "Groundwater Questionnaire" describes the state of the groundwater protection program, as of the time the questionnaire was submitted (generally 2007, unless otherwise stated).The "Effluent Report" lists the quantities of radionuclides released from the...
Renewed License Issued 12/22/2005On this page:Application InformationLicense Renewal Review ScheduleEnvironmental Impact StatementSafety Evaluation ReportPublic InvolvementProject Managers for Point Beach Nuclear PlantApplication Information:This page includes links to files i...
December 3, 1996 EA 96-273Mr. R. A. Abdoo Chairman, President, and Chief Executive Officer Wisconsin Energy Corporation 231 West Michigan Street - P440 Milwaukee, Wisconsin 53201 SUBJECT: POINT BEACH NUCLEAR POWER PLANT - UNITS 1 AND 2
NOTICE OF VIOLATION AND PROPOSED IM...
August 8, 1997 EA 97-075 Mr. Richard R. Grigg President and Chief Operating Officer Wisconsin Electric Power Company 231 W. Michigan Post Office Box 2046 Milwaukee, Wisconsin 53201 SUBJECT: EXERCISE OF ENFORCEMENT DISCRETION (NRC Inspection Reports 50-266(301)/96018(D...
Human Factors Information System (HFIS)
U.S. Nuclear Regulatory Commission
From 01/01/2005 to 12/31/2005
Page 1 of 5
07/18/2006 09:27:17
2x National Average:
Total Number of Hits:
National Average:
IR/LER Category Analysis by Docket ReportDocument Types: IR, LER
Natio...
subscribe to page updatesNRC Documentation and Acknowledgement of CompletionPoint Beach Peak Nuclear Plant, Units 1 and 2 – Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned From the Fukushima Dai-Ichi AccidentDocumentation of the Com...
The following table refers to NRC-approved power uprate applications. The table shows the ADAMS accession number for (1) each plant's power uprate application, (2) any supplement to the application, and (3) the license amendment approving the application and allowing the l...
March 17, 2004EA-03-181Mr. Gary Van Middlesworth
Vice President - Nuclear Assessment Programs
Site-Vice President
Point Beach Nuclear Plant
Nuclear Management Company, LLC
6610 Nuclear Road
Two Rivers, WI 54241-9516SUBJECT: NOTICE OF VIOLATION AND PROPOSED IMP...
December 12, 2002
Mr. Fred J. Cayia
Site Vice President
Point Beach Nuclear Plant
Nuclear Management Company, LLC
6610 Nuclear Road
Two Rivers, WI 54241
SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - BULLETIN 2002-01,
“REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REAC...
NRC NEWSU. S. NUCLEAR REGULATORY COMMISSIONOFFICE OF PUBLIC AFFAIRS, REGION III801 Warrenville Road, Lisle IL 60532CONTACT: Jan Strasma (630) 829-9663/e-mail: rjs2@nrc.govAngela Dauginas (630) 829-9662/e-mail: opa3@nrc.govNEWS ANNOUNCEMENT: RIII-97-26March 7, ...
NRC NEWSU. S. NUCLEAR REGULATORY COMMISSIONOFFICE OF PUBLIC AFFAIRS, REGION III801 Warrenville Road, Lisle IL 60532 NEWS ANNOUNCEMENT: RIII-99-24 April 6, 1999CONTACT: Jan Strasma (630) 829-9663/e-mail: rjs2@nrc.gov Angela Greenman (630) 829-9662/e-mail: ...
August 16, 2002
Mr. Mark Reddeman
Site Vice President
Kewaunee and Point Beach Nuclear Plants
Nuclear Management Company, LLC
6610 Nuclear Road
Two Rivers, WI 54241
SUBJECT: POINT BEACH NUCLEAR POWER PLANT, UNITS 1 AND 2 -
BULLETIN 2001-01, “CIRCUMFERENTIAL CRACKING OF REAC...
September 29, 2004EA-04-038Mr. Dennis Koehl Site-Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516SUBJECT:EXERCISE OF ENFORCEMENT DISCRETION[NRC OFFICE OF INVESTIGATIONS REPORT NO. 3-2001-033]Dear Mr. Koehl:Thi...
On this page:
Application InformationSubsequent License Renewal Review ScheduleSafety EvaluationEnvironmental ReviewPublic InvolvementProject Managers for Point Beach Nuclear Plant, Units 1 and 2Application InformationThis page includes links to files in non-HTML form...
subscribe to page updatesNRC Documentation and Acknowledgement of CompletionPoint Beach Peak Nuclear Plant, Units 1 and 2 – Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned From the Fukushima Dai-Ichi AccidentDocumentation of the Com...