Standard Technical Specifications — General Electric Plants (BWR/4) (NUREG-1433, Revision 5)

File Title
Volume 1 Standard Technical Specifications — General Electric Plants (BWR/4): Specifications (Revision 5)
Volume 2 Standard Technical Specifications — General Electric Plants (BWR/4): Bases (Revision 5)