Event Report Guidelines 10 CFR 50.72(b)(3)(xiii) (NUREG-1022, Revision 3, Supplement 1 — Final Report)
On this page:
Download complete document
Publication Information
Manuscript Completed: September 2014
Date Published: September 2014
Prepared by:
Aron Lewin
Office of Nuclear Reactor Regulation
U.S. Nuclear Regulatory Commission
Washington, DC 20555
Abstract
NUREG-1022, Revision 3, "Event Reporting Guidelines: 10 CFR 50.72 and 50.73," contains guidelines that the staff of the U.S. Nuclear Regulatory Commission (NRC) considers acceptable for use in meeting the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.72, "Immediate Notification Requirements for Operating Nuclear Power Reactors," and 50.73, “Licensee Event Report System.” Section 3.2.13, “Loss of Emergency Preparedness Capabilities,” of NUREG-1022, Revision 3, contains guidance for reporting under 10 CFR 50.72(b)(3)(xiii). Regulations in 10 CFR 50.72(b)(3)(xiii) require reports for a major loss of emergency assessment capability, offsite response capability, or communications capability. Much of the guidance found in Section 3.2.13 of NUREG-1022, Revision 3, is subject to engineering judgment. This supplement to NUREG-1022, Revision 3, endorses Nuclear Energy Institute (NEI) 13-01, "Reportable Action Levels for Loss of Emergency Preparedness Capabilities," dated July 2014. NEI 13-01 provides specific guidance for reporting under 10 CFR 50.72(b)(3)(xiii) and, as a result, reduces the need for engineering judgment. Guidance found in NEI 13-01 provides for an acceptable alternative to guidance found in Section 3.2.13 of NUREG-1022, Revision 3.