The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant Unit 2 (NUREG-0847, Supplement 26)

On this page:

Download complete document

Publication Information

Manuscript Completed :  May 2013
Date Published:  June 2013

Docket No. 50-391: Tennessee Valley Authority

Office of Nuclear Reactor Regulation
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

This report supplements the safety evaluation report (SER), NUREG-0847 (June 1982), Supplement No. 25 (November 2011, Agencywide Documents Access and Management System (ADAMS) Accession No. ML12011A024), with respect to the application filed by the Tennessee Valley Authority (TVA), as applicant and owner, for a license to operate Watts Bar Nuclear Plant (WBN) Unit 2 (Docket No 50-391).

In its SER and Supplemental SER (SSER) Nos. 1 through 20 issued by the Office of Nuclear Reactor Regulation (NRR) of the U.S. Nuclear Regulatory Commission (NRC), the NRC staff documented its safety evaluation and determination that WBN Unit 1 met all applicable regulations and regulatory guidance. Based on satisfactory findings from all applicable inspections, on February 7, 1996, the NRC issued a full-power operating license (OL) to WBN Unit 1, authorizing operation up to 100-percent power.

In SSER 21, the NRC staff addressed TVA's application for a license to operate WBN Unit 2, and provided information regarding the status of the items remaining to be resolved, which were outstanding at the time that TVA deferred construction of WBN Unit 2, and were not evaluated and resolved as part of the licensing of WBN Unit 1. Beginning with SSER 22, the NRC staff documented its ongoing evaluation and closure of open items in support of TVA's application for a license to operate WBN Unit 2.

In this and future SSERs, the NRC staff continues its documentation of its review of open items in support of TVA's application for an operating license for WBN Unit 2.

Page Last Reviewed/Updated Friday, April 11, 2025