Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Implementation of Advanced Multigroup Nodal and Pin Power Reconstruction Methods into PARCS 3.1 (NUREG/IA-0416)

On this page:

Download complete document

Publication Information

Manuscript Completed: December 2010
Date Published: May 2012

Prepared by:
Joo-il Yoon, Han Gyu Joo, Seung Hoon Ahn

A. Calvo, NRC Project Manager

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
Under the Thermal-Hydraulic Code Applications and Maintenance Program (CAMP)

Published by:
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

The original multi-group solver of PARCS uses a nodal expansion method combined with onenode calculation scheme. But the neutronics solver was inefficient for application to the real-size reactor cores because of its slow performance. Moreover, the existing pin power reconstruction with the corner point balancing method does not support the multi-group structure. In order to improve the performance for multi-group problems, the semi-analytic nodal method and pin power reconstruction with the source expansion formulation have been incorporated into the PARCS code. The purpose of the nodal formulation is to solve the transverse-integrated onedimensional neutron balance equation. Also, a two-level CMFD method in which the two-group CMFD is used for accelerating the multi-group CMFD calculation has been constructed to improve the calculation efficiency. The newly implemented routines are written in the form of a static library of FORTRAN90 that forms link to the PARCS code during compilation. The new numerical method has been evaluated over benchmark problems for steady-state and transient calculations of real-size reactor core. The calculation results show an excellent agreement with the reference results of the benchmark problem. The computing time of the new routines was about 4 times shorter than that of the original routine.

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021