Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Test LOBI–BL06: Post-Test Analysis and RELAP5/MOD3.2.1 Code Performance Assessment (NUREG/IA-0162)

On this page:

Download complete document

Publication Information

Date Published: April 1999

Prepared by:
T. Fiore
P. Marsili

Agenzia Nazionale per la Protezione dell' Ambiente (ANPA)
Via Vitaliano Brancati 48
00144 Roma, Italy

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Code Application and Maintenance Program (CAMP)

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

This report deals with the results of the "post-test analysis" of the test BL-06 performed in the LOBI/MOD2 test facility.

LOBI/MOD2 is an integral test facility that represents, at approximately 1:712 scale, a four loop (KWU design, 1300 MWe) PWR.

The test BL-06 simulates a 1% cold leg break LOCA, with the main coolant pumps switched off very late in the transient.

The calculations have been realized with the code Relap5/Mod3.2.1. The uncertainty evaluation of the calculation result has been performed using a specific method developed by Pisa University.

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021