Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Study of Transients Related to AMSAC Actuation, Sensitivity Analysis (NUREG/IA-0150)

On this page:

Download complete document

Publication Information

Date Published: November 1998

Prepared by:
J.M. Posada, P.M.S.A., F. Revetos, A.N.A., J. Sanchez-Baptista, A.N.A.
A. Perez-Navas, A.N.A., P. Moreno, P.M.S.A.

P.M.S.A.
Av. Viñuelas, N°33, 1°D
Tres Cantos – 28760 MADRID
SPAIN

Asociacion Nuclear ASCO (A.N.A)
Paral.lel, 51
08004 BARCELONA
SPAIN

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Code Application and Maintenance Program (CAMP)

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

The Asociación Nuclear Ascó (ANA) has prepared a model of Ascó NPP using, RELAP5/MOD3.2. This model, which includes thermal-hydraulics, kinetics and protection and control systems, has been qualified in previous calculations of several actual plant transients.

Ascó NPP is a two unit station of three loop Pressurized Water Reactors (PWR) of Westinghouse design operated by ANA. ANA is a spanish utility that contributes to the Code Application and Maintenance Project (CAMP) as a member of UNIDAD ELECTRIICA S. A. (UNESA).

This report summarizes the results obtained with Ascó NPP model for a loss of normal feedwater ATWS event and presents a sensitivity analysis to kinetic parameters for the same transient.

The phenomenology prediction has been useful from the operation and safety point of view.

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021