The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Application of Full Power Blackout for C. N. Almaraz with RELAP5/MOD2 (NUREG/IA-0123, ICSP–AL–BOUT–R)
On this page:
Download complete document
Publication Information
Date Published: June 1993
Prepared by:
A. L. Lechas
C. N. Almaraz I y II
c/Claudio Coello, 123
28006 - Madrid, Spain
Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Thermal-Hydraulic Code Assessment
and Application Program (ICAP)
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001
Abstract
The analysis group of Almaraz Nuclear Power Plant has developed a model of the plant with RELAP 5 / MOD. 2 / 36:04. This model is the result of the work-experience on the code RELAP 5 / MOD. 1 / that was the standar code during the period 1.984/1.989. Different solutions were adopted in the network to adecuate the model to RELAP 5 MOD. 2 Computer Code.
This transient was selected for ICAP because it presents an experience with the same transient calculated with RELAP 5 / MOD. 1 / CY 29 computer code. The comparison between both analysis will be interesting.
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021