Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Assessment of RELAP5/MOD2 Against a Turbine Trip From 100% Power in the Vandellos II Nuclear Power Plant (NUREG/IA-0108,ICSP–V2–R100–R)

On this page:

Download complete document

Publication Information

Date Published: June 1993

Prepared by:
C. Llopis/A. N. V.
J. Perez, R. Mendizabal/C. S. N.

Asociacion Nuclear Vandellos (A. N. V.)
Consejo de Seguridad Nuclear (C. S. N.)
Madrid, Spain

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Thermal-Hydraulic Code Assessment
and Application Program (ICAP)

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

An assessment of RELAP5/MOD2 cycle 36.04 against a turbine trip from 100% power in Vandellós II NPP (Spain) is presented. The work is inscribed in the framework of the spanish contribution to ICAP Project.

The model used in the simulation consists of a single loop, a steam generator and a steam line up to the steam header all of them enlarged on a scale of 3:1; and full-scaled reactor vessel and pressurizer.

The results of the calculations have been in reasonable agreement with plant measurements. An additional study has been performed, to check the ability of a model in which all the plant components are full-scaled to reproduce the transient. A second study has been performed using the Homogeneous Equilibrium Model in the pressurizer, trying to elucidate the influence of the velocity slip in the primary depressurization rate.

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021