Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

RELAP5/MOD2 Post-Test Calculation of the OECD LOFT Experiment LP–SB–2 (NUREG/IA–0087, ICSP–LP–SB–2–R)

On this page:

Download complete document

Publication Information

Date Published: April 1992

Prepared by:
J. Perez, R. Mendizabal

Consejo de Seguridad Nuclear (C.S.N.)
Madrid, Spain

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Thermal-Hydraulic Code Assessment
and Application Program (ICAP)

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

This document presents the analysis of the OECD LOFT LP–SB–2 experiment performed by the Consejo de Seguridad Nuclear of Spain working group making use of RELAP5/MOD2 in the frame of the Spanish LOFT Project.

LP–SB–2 experiment studies the effect of a delayed pump trip in a small break LOCA scenario with a 3 inches equivalent diameter break in the hot leg of a commercial PWR.

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021