Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Assessment of RELAP5/MOD 2, Cycle 36, Against FIX-Il Split Break Experiment No. 3027 (NUREG/IA-0005)

On this page:

Download complete document

Publication Information

Date Published: September 1986

Prepared by:
J. Eriksson

Swedish Nuclear Power Inspectorate
P.O. Box 27106
S102 #52 Stockholm, Sweden

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555

Availability Notice

Abstract

The FIX-II split break experiment No. 3027 has been analyzed using the RELAP5/Mod2 code. The code version used, Cycle 36, is a frozen version of the code.

Four different prediction calculations were carried out to study the sensitivity on various parameters to changes of break discharge, initial coolant mass, and passive heat structures. The differences between the calculations and the experiment have been quantified over intervals in real time for a number of variables available from the measurements during the experiment.

The core inventory expressed by the differential pressure over the core was generally underpredicted. Dryout times were generally overpredicted, probably due to differences in the used dryout correlation.

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021