Change Notice 04-001

Issue Date: 01/14/04

All Files in ZIP Format cn 04-001.zip

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

  DELETED:
Number
Date TRANSMITTED:
Number
 
  Date
1. IMC 0307 12/12/03 IMC 0307 01/14/04
2. IMC 0612 06/20/03 IMC 0612 01/14/04

TRAINING: No special training requirements have been identified for any documents issued with this change notice.
REMARKS:

IMC 0307 Reactor Oversight Process Self-Assessment Program
IMC 0612 Power Reactor Inspection Reports

A decision was reached at the DRP/DRS counterpart meeting held on December 17-18, 2003, to change the inspection report timeliness to 45 calendar days for all inspection reports, with exception of reactive inspection reports, which will stay at 30 days. The inspection manual chapters identified above have been modified to reflect this decision.

DISTRIBUTION: Standard