Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Change Notice 99-014

Issue Date: 09/13/99

NRC INSPECTION MANUAL IIPB

All Files in ZIP Format cn 99-014.zip

 


 

  DELETED:   TRANSMITTED:  
  Number Date Number Date
         
1. IMC 2901 03/24/94 IMC 2901 09/13/99
2. TI 2515/121 05/24/94 ---- ----
3. TI 2515/124 08/25/94 ---- ----

TI 2515/121 (Verification of Mark I Hardened Vent Modifications (GL 89-16) is deleted. The inspection requirements of this TI have been completed.TI 2515/124 (Seismic Adequacy of Mechanical and Electrical Equipment In Operating Reactors (GL 87-02, USI A-46) is deleted. The inspection requirements of this TI have been completed.

TRAINING: No special training requirements have been identified for any documents issued with this change notice.
REMARKS: IMC 2901 (Team Inspections) has been revised to include the require-ment that an executive summary in plain English be included with each team inspection report. This requirement is in compliance with SECY 99-070. The IMC was also revised to reflect the current organization in NRR.
 
 
DISTRIBUTION: Standard

END