Information Notice No. 83-84: Cracked and Broken Piston Rods in Brown Bovery Electric Type 5HK Breakers
SSINS No.: 6835 IN 83-84 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 December 30, 1983 Information Notice No. 83-84: CRACKED AND BROKEN PISTON RODS IN BROWN BOVERY ELECTRIC TYPE 5HK BREAKERS Addressees: All holders of a nuclear power reactor operating license (OL) or construction permit (CP). Purpose: This information notice is provided as notification of a potentially significant problem pertaining to Brown Bovery Electric (BBE) type 5HK 250/350, 1200/2000 ampere circuit breakers. Addressees are expected to review the information for applicability to their facilities. No specific action or response is required at this time. Description of Circumstances: On March 21, 1983, Detroit Edison notified the NRC under the provisions of 10 CFR 50.55(e) of a potential problem with BBE 5HK 4160 volt breaker puffer piston rods at the Fermi 2 nuclear plant. The puffer piston connecting rods developed cracks and one shaft failed. The manufacturer's part number is 193642B. The cracking and failure occurred at the hole in the shaft where the linkage is connected by a pin. These breakers were manufactured in 1973. A total of five breakers were affected at the Fermi 2 site. On September 12, 1983, Detroit Edison advised an NRC inspector that during a receiving inspection at the Fermi plant, spare puffer piston connecting rods were found to be defective. They were all returned to the vendor. BBE informed the NRC on November 29, 1983 that the damage to these puffer piston connecting rods were a result of shipping problems and were riot related to the manufacturing process. On October 12, 1983, BBE provided the NRC with an Interim Report pertaining to the 5HK breaker puffer piston connecting rod problem. The report indicated that at a Southern California Edison (SCE) non-nuclear plant eight puffer piston connecting rods were found to be broken. Puffer pistons in the BBE 5HK breakers perform two functions. For low current interruptions the puffer is needed to assist the magnetic forces to move the 8312120093 . IN 83-84 December 30, 1983 Page 2 of 2 arc into the interrupting chamber. The arc may not be extinguished if the puffer piston fails. The other function performed by the puffer piston is to provide a pneumatic cushion which reduces the shock forces imposed on the mechanism and current carrying parts upon opening. A failure of the puffer piston could reduce the number of operations before maintenance on the breaker would be necessary. BBE indicated that no breaker failed because of a broken puffer piston rod, however, the breaker's capability to interrupt at low current may be impaired. BBE subjected broken piston rods to failure analysis including microscopic analysis of the failed area and found that failed parts were limited to those made with the material identified as Zytel 101 (Nylon 6/6). Since 1980, the parts have been manufactured with a toughened and reinforced material called "Nylatil." No problems have been reported on Nylatil material parts. Based on the test results and presently available information, BBE recommends inspecting for cracked or broken puffer piston rods at normal maintenance intervals and replacing the puffer piston assembly if this condition is found. It should be noted that the nozzle of the puffer piston must be removed to inspect the rod properly. Attached is a list provided by BBE of 5HK circuit breakers that they supplied for use in Class 1E applications at nuclear power plants, and which may be affected. Since breakers can also be obtained from intermediate sources, the list may not be complete. It is suggested that licensees evaluate their equipment lists to determine if BBE 5HK breakers are used in safety-related applications in their plant. Inspection of circuit breakers with manufacturing dates of 1981 or later for cracking or breakage of puffer piston rods should not be necessary. If you have any questions regarding this matter, please contact the Regional Administrator of the appropriate NRC Regional Office, or this Office. Edward L. Jordan Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement Technical Contact: W. Laudan, IE (301) 492-9759 Attachments: 1. List of 5HK Breaker Customers 2. List of Recently Issued IE Information Notices . Attachment 1 IN 83-84 December 30, 1983 Page 1 of 3 BBE TYPE 5HK BREAKER CUSTOMERS CUSTOMER BBE SALES ORDER DATE OF MANUFACTURE CEI Perry 1&2 51958 8/78, 9/78, 10/78 CFE Laguna Verde 53462 11/74 - 1/80 CP&L Brunswick 1 54792 10/81 Brunswick 2 47219 11/71 - 8/72 49839 3/74 - 3/79 Cincinnati G&E Zimmer 51828 6/77 - 11/77 Commonwealth Edison LaSalle County 1&2 50080 10/75 - 12/75 52612 4/78, 5/78 Zion 1&2 45122 5/70 - 2/71 Consumers Power Midland 1&2 50382 4/75 - 9/75 9/75 - 6/76 8/75 - 9/75 Detroit Edison Fermi 2 47196 12/73 - 9/74 Duke Catawba 1 & 2 50465 4/78 - 4/79 McGuire 1 & 2 48560 9/72 - 11/74 Oconee 3 44349 8/69 - 8/71 Duquesne Light Co. Beaver Valley 1&2 46690 8/71 - 8/78 Florida Power Corp Crystal River 3 46256 11/70 Georgia Power Company Vogtle 1 51903 9/81 - 3/82 Vogtle 2 51904 7/81 - 2/83 . Attachment 1 IN 83-84 December 30, 1983 Page 2 of 3 BBE TYPE 5HK BREAKER CUSTOMERS CUSTOMER CUSTOMER BBE SALES ORDER DATE OF MANUFACTURE Gulf States Utilities River Bend 1&2 51126 11/80 - 3/83 51128 10/80 - 4/82 Indiana Michigan Electric Co. Cook 1 44322 8/71 - 3/72 Cook 2 53372 5/79 Mississippi Power & Light Grand Gulf 1&2 50469 1/76 - 5/77 Northern States Power Prairie Island 1&2 44477 2/70 - 10/71 PE Limerick 1&2 47651 3/77 - 5/77 PSE&G Hope Creek 1&2 52260 10/79 - 1/90 Psi Marble Hill 2 52661 11/80 - 8/82 PSNH Seabrook 1&2 50750 1/77 - 8/77 Portland General Electric Trojan 47354 2/73 Sacramento Municipal Utility District Rancho Seco 1 45966 5/71 South Texas Project 1 52769 10/78 Project 2 52914 5/79 - 12/79 Southern California Edison San Onofre 2&3 50395 3/76 - 4/76 Taiwan Kuo Sheng/Unit 1&2 50735 5/77 - 12/76, 11/75 - 12/75, 3/76 . Attachment 1 IN 83-84 December 30, 1983 Page 3 of 3 BBE TYPE 5HK BREAKER CUSTOMERS CUSTOMER BBE SALES ORDER DATE OF MANUFACTURE VEPCO North Anna 2 48709 9/76, 10/76 WPPSS WNP 1&2 51659 3/78 - 1/79 .
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021