Information Notice No. 83-13: Design Misapplication of Bergen-Paterson Standard Strut Restraint Clamp
SSINS No.: 6835 IN 83-13 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C. 20555 March 21, 1983 INFORMATION NOTICE NO. 83-13: DESIGN MISAPPLICATION OF BERGEN-PATERSON STANDARD STRUT RESTRAINT CLAMP Addressees: All nuclear power reactor facilities holding an operating licensee (OL) or construction permit (CP). Purpose: This information notice is provided as a notification of a design misapplication of a standard strut restraint clamp provided by Bergen-Paterson Pipesupport Corporation. It is expected that recipients will review the information for applicability to their facilities. No specific action or response is required. Description of Circumstances: On February 24, 1983, Bergen-Paterson Pipesupport Corporation sent a Part 21 report to the NRC identifying a design misapplication involving one of their standard strut restraint clamps. The clamp involved was shown in Bergen- Paterson's Catalog #66 and was called "EA-3" Strut Restraint Clamp. A sketch from the Bergen-Paterson catalog showing the EA-3 clamp is given in Attachment 1. A revised sketch from Bergen-Paterson showing the acceptable application of the EA-3 clamp for the catalog load ratings is given in Attachment 2. Attachment 3 contains a sketch showing the misapplication of the EA-3 clamp for the load ratings given in Catalog #66. Bergen-Paterson has been testing the EA-3 clamp to determine actual load capacities for the condition shown in Attachment 3. Preliminary results of sample sizes tested have shown that some clamps are able to sustain the catalog load ratings without failure when shear lugs are welded to the pipe as shown in Attachment 3 (Part No. 4). However, for cases where the clamp is loaded as shown in Attachment 3 with no shear lugs present, tests have demonstrated that the clamps have sustantially lower capabilities and can not sustain the catalog load ratings without excessive deflections. Bergen-Paterson has identified 31 plants that were supplied the EA-3 clamps (these plants are listed in Attachment 4). Of the 31 identified, Bergen- Paterson had original design responsibility for supports on 23 plants. Based on Bergen-Paterson's review of its available design information, Bergen- Paterson has identified 2 facilities in which the design loadings exceed the tested capability of the clamps. 8212060387 . IN 83-13 March 21, 1983 Page 2 of 2 It is suggested that holders of operating licenses or construction permits review this information for applicability to disigns at their facilities. No written response to this notice is required. If you have any questions regarding this matter, please contact the Regional Administrator of the appropriate NRC Regional Office, or this office. Edward L. Jordan, Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement Technical Contact: J. R. Fair (301) 492-4509 Attachments: 1. EA-3 Strut Restraint Clamp 2. Acceptable application of EA-3 clamp 3. Misapplication of EA-3 clamp 4. Plants using EA-3 clamp 5. List of Recently Issued Information Notices . Attachment 4 IN 83-13 March 21, 1983 Plants with EA-3 Strut Restraint Clamp No Bergen-Paterson Design Responsibility Brunswick 1 & 2 Turkey Pt. 3 & 4 Indian Pt. 3 Limerick 1 & 2 Zimmer Bergen-Paterson Design Responsibility Pilgrim 1 Dresden 2 & 3 Quad Cities 1 & 2 Palisades St. Lucie 1 & 2 Hatch 1 & 2 Oyster Creek TMI-2 Millstone 1 Monticello Fort Calhoun Trojan Ginna Browns Ferry 1, 2, & 3 FitzPatrick Duane Arnold Indian Pt. 2
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021