Information Notice No. 82-34, Revision 1: Welds in Main Control Panels
SSINS No.: 6835 IN 82-34 Rev. 1 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C. 20555 September 17, 1982 Information Notice No. 82-34, REV 1: WELDS IN MAIN CONTROL PANELS Addressees: All holders of a nuclear power reactor operating license (OL) or construction permit (CP). Purpose: This revision is made to provide the specific time period during which R1 the potentially significant problem pertaining to welds in main R1 control panels may have existed. The panels of concern were supplied to R1 a number of operating plants and construction sites by Systems Control R1 of Iron Mountain, Michigan prior to March 1980; Reliance Electric of R1 Stone Mountain, Georgia prior to March 1982; and Comsip of Linden, New R1 Jersey prior to March 1982. Only those panels manufactured prior to R1 these dates are now included in the list of sites which may have panels R1 with defective welds. The potential safety significance of this problem R1 is still under review by the Nuclear Regulatory Commission (NRC) staff. R1 If NRC evaluation so indicates, further licensee action may be R1 requested. In the interim, the staff expects licensees to review the R1 information herein for applicability to their facilities. No specific R1 action or response is required at this time. R1 Description of Circumstances: Inspections at the vendors' facilities conducted in March of 1980 R1 (Systems Control) and March of 1982 (Reliance and Comsip) disclosed R1 numerous welding practices not in accordance with the American Welding Society (AWS) Standards and several quality assurance practices not in compliance with the vendors' procedures or NRC requirements. Among these were the following: 1. Certified material test reports not obtained, not available, R1 or not in accordance with AWS specifications 2. Changes to drawings not properly reviewed and accepted 3. Welding being done by unqualified individuals without qualified procedures and using uncalibrated equipment 4. Poor welds, including lack of fusion, undercuts in excess of 1/32", and weld wire remnants from 112" to 4" in accepted welds. 5. Welding procedure qualification and welder qualification testing required by AWS Standards not accomplished 6. Essential variables as specified by AWS Standards violated 7. Management oversight not accomplished for lengthy periods; lack of separate review and approval for Quality Assurance 8. Unidentified weld filler metal used 9. Gas tungsten arc welding (GTAW) process used but not documented in place of required gas metal arc welding (GMAW) or shielded metal arc welding (SMAW) processes 8208190222 . IN 82-34, Rev 1 September 17, 1982 Page 2 of 2 Since the inspection determined that the non-conforming practices of all three vendors were similar and widespread at each manufacturing R1 facility, it can be assumed that any panel furnished by these R1 vendors prior to the respective NRC inspection dates may have R1 defective welds. Although the vendors have seismically qualified R1 similar panels, improper welding practices and defective welds prior R1 to the NRC inspection may affect the validity of those qualifications. R1 Some control panels were identified during vendor inspections as R1 having defective welds. Sites which have received panels that may have defective welds are as follows: Palo Verde 1, 2, and 3; Byron 1 and 2; R1 Braidwood 1 and 2; Midland 1 and 2; Vogtle 1 and 2; Callaway 1; R1 Comanche Peak 1 and 2; Waterford 3; Wolf Creek; Brunswick 1 and 2; R1 Seabrook; Susquehanna; Three Mile Island 1; Salem 1 and 2; Hope Creek; Monticello; Perry 1 and 2; Hatch 1 and 2; Indian Point 2; Shearon R1 Harris 1, 2, 3, and 4; St. Lucie 2; Shoreham; Virgil Summer; Dresden; R1 and LaSalle. If you have any questions regarding this matter, please contact the administrator of the appropriate Regional Office or this office. Edward L. Jordan, Director Division of Engineering and Quality Assurance Office of Inspection and Enforcement Technical Contact: M. S. Wegner 301-492-4511 Attachment: List of Recently Issued IE Information Notices
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021