IE Circular No. 80-13, Grid Strap Damage in Westinghouse Fuel Assemblies
SSINS No.: 6830 Accessions No.: 7910250495 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 May 28, 1980 IE Circular No. 80-13 GRID STRAP DAMAGE IN WESTINGHOUSE FUEL ASSEMBLIES Description of Circumstances: During the refueling operation at Salem Unit 1, it was noted by the licensee that some of the assemblies that were removed had suffered grip strap mechanics damage. This was reported to the NRC in LER 79-44. Subsequent to this discovery all fuel assemblies were removed from the core for examination. The degree of the damage to the grid straps was classified in three categories: small pieces missing (15 assemblies), grid material ripped and laid over (5 assemblies), larger sections missing and fuel pins exposed (11 assemblies). No damage to the fuel pins was observed. A total of 31 assemblies suffered some grid damage. The damage appeared to be the result of corner to corner interaction of the grid straps of diagonally adjacent fuel assemblies during the vertical loading and unloading movements. No correlation of the damage to core location, grid strap elevation, or manufacturing and shipping batches has been identified. The licensee and the fuel manufacturer established the following guidelines for reloading damaged assemblies: (1) those assemblies with full width pieces missing will not be reloaded for cycle 2, (2) those assemblies with deformed edges and those with small pieces missing will be reloaded with special procedures to prevent further damage. Sale Unit 1 is fueled with 17X17 Westinghouse assemblies. Similar grid problems have occurred at other facilities fueled with 14X14 and 15X15 Westinghouse assemblies; however, fewer assemblies were damaged in those instances. Recommended Actions: All licensees using 14X14, 15X15, or 17X17 Westinghouse assemblies are advised to: (1) Visually inspect grid straps of those fuel assemblies which are discharged from the core as well as those assemblies which are moved to the spent fuel pool for control rod replacement and are subsequently returned to the core. . IE Circular No. 80-13 May 28, 1980 Page 2 of 2 (2) Review the fuel handling precautions recommended by Westinghouse at a meeting on May 25, 1979, with NRC and the licensee for Salem (Attachment 1). Adopt those recommendations which are pertinent. No written response to this Circular is required. If you required additional information regarding these matters, contact the Director of the appropriate NRC Regional Office. Attachment: Summary of Meeting Notice dated 5/30/79
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021