Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for October 10, 2025

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 97 Coastdown to Refueling Outage *
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 0 2025-09-26 Refueling Outage
Limerick 1 100
Limerick 2 100 *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 82 Coastdown to Refueling Outage *
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 Minimum 250 MVAR
Susquehanna 2 100 Minimum 300 MVAR

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 96 Reduced Power for Maintenance *
Farley 1 0 2025-09-28 Refueling Outage
Farley 2 100
Harris 1 0 2025-10-04 Refueling Outage
Hatch 1 100
Hatch 2 78 Reduced Power for Maintenance *
McGuire 1 100
McGuire 2 0 2025-10-10 Forced Outage; See EN 57977 * 1
North Anna 1 0 2025-09-07 Refueling Outage
North Anna 2 100
Oconee 1 100
Oconee 2 96 Coastdown to Refueling Outage
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 2025-09-20 Refueling Outage
Saint Lucie 2 100
Sequoyah 1 0 2025-10-04 Refueling Outage
Sequoyah 2 100
Summer 12 Increasing Power *
Surry 1 97 Coastdown to Refueling Outage *
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 100 *
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 0 2025-10-06 Refueling Outage
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 65 Increasing Power *
D.C. Cook 1 100
D.C. Cook 2 0 2025-09-20 Refueling Outage
Davis-Besse 100
Dresden 2 92 Coastdown to Refueling Outage *
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 0 2025-09-09 Plant Restart
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 96 Coastdown to Refueling Outage *
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 70 Holding Power until Refueling Outage
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 2025-10-05 Refueling Outage *
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 2025-10-04 Refueling Outage
River Bend Station 1 0 2025-10-10 Forced Outage; See EN57975 * 1
South Texas 1 100
South Texas 2 0 2025-10-04 Refueling Outage
Waterford 3 94 Transformer Limitation; Conservative Operations
Wolf Creek 1 0 2025-10-02 Refueling Outage

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.