Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 High System Voltage Action *
Beaver Valley 2 99 Steam Generator Limitations. High System Voltage Action *
Calvert Cliffs 1 100 High System Voltage Action *
Calvert Cliffs 2 100 High System Voltage Action *
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100 *
Salem 1 70 Increasing Power *
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 High System Voltage Action *
Susquehanna 2 0 2025-03-24 Refueling Outage. High System Voltage Action *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 0 2025-05-30 Forced Outage; See EN#57737 *
Browns Ferry 3 100 *
Brunswick 1 100 *
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 0 2025-03-16 Refueling Outage
Harris 1 100
Hatch 1 91 Reduced Power for Rod Pattern Adjustment *
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 2025-05-30 Forced Outage; Main Generator Maintenance
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 62 Holding Power *
Vogtle 2 100
Vogtle 3 70 Increasing Power *
Vogtle 4 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 96 100% Electrical Capability; Reduced Power for Rod Pattern Adjustment *
D.C. Cook 1 100 High System Voltage Action *
D.C. Cook 2 100 High System Voltage Action *
Davis-Besse 100 High System Voltage Action *
Dresden 2 84 Reduced Power for Maintenance *
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 27 Shutting Down; Maintenance Outage *
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 2025-03-29 Refueling Outage
Columbia Generating Station 0 2025-04-12 Refueling Outage *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 0 2025-04-26 Refueling Outage
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.