Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for April 16, 2025

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 99 Steam Generator Limitations
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 85 Coastdown to Refueling Outage
Millstone 2 100
Millstone 3 0 2025-04-11 Refueling Outage
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 0 2025-04-13 Refueling Outage *
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 0 2025-03-24 Refueling Outage

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 67 Increasing Power *
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 0 2025-03-16 Refueling Outage
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 0 2025-04-02 Refueling Outage *
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 59 Increasing Power *
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 2024-07-31 Extended Outage
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 70 Holding Power for Fuel Efficiency
Watts Bar 1 0 2025-01-17 Forced Outage
Watts Bar 2 0 2025-04-12 Refueling Outage

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 0 2025-04-14 Refueling Outage *
Clinton 99 100% Electrical Capability
D.C. Cook 1 0 2025-03-22 Refueling Outage *
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 95 Coastdown to Refueling Outage
Perry 1 0 2025-03-17 Refueling Outage
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 40 Reduced Power for Maintenance *
Prairie Island 2 100
Quad Cities 1 87 Reduced Power for Economic Dispatch *
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 2025-03-29 Refueling Outage
Columbia Generating Station 0 2025-04-12 Refueling Outage
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 0 2025-04-13 Refueling Outage
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 0 2025-03-28 Refueling Outage
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 97 Limited by Core Flow *
South Texas 1 100
South Texas 2 100
Waterford 3 94 Transformer Limitation
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.