Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for October 27, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2024-10-13 Refueling Outage;
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 2024-10-04 Refueling Outage *
Millstone 3 100
Nine Mile Point 1 97 Holding Power for Fuel Conditioning *
Nine Mile Point 2 100
Peach Bottom 2 0 2024-10-21 Refueling Outage
Peach Bottom 3 100
Salem 1 100
Salem 2 0 2024-10-06 Refueling Outage
Seabrook 1 0 2024-10-05 Refueling Outage
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 0 2024-10-27 Maintenance Outage *
Brunswick 2 100
Catawba 1 0 2024-10-01 Refueling Outage *
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 0 2024-10-22 Refueling Outage
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 39 Holding Power; Issues with in-core detectors
Sequoyah 1 100 *
Sequoyah 2 0 2024-07-31 Refueling Outage
Summer 0 2024-09-21 Refueling Outage *
Surry 1 100
Surry 2 0 2024-10-27 Refueling Outage *
Turkey Point 3 0 2024-10-13 Refueling Outage
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 0 2024-10-13 Refueling Outage
Vogtle 4 100
Watts Bar 1 99 Coastdown To Refueling Outage
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 86 Increasing Power *
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 90 Coastdown To Refueling Outage *
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 0 2024-10-12 Refueling Outage
Prairie Island 1 0 2024-09-21 Refueling Outage
Prairie Island 2 97 Reduced Power for Economic Dispatch *
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2024-09-28 Refueling Outage
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 2024-10-21 Refueling Outage
Cooper 0 2024-09-29 Refueling Outage
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2024-10-05 Refueling Outage
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 0 2024-10-05 Refueling Outage
South Texas 2 100
Waterford 3 94 Transformer Limitation.
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.