Power Reactor Status Report for October 13, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 High System Voltage Action *
Beaver Valley 2 0 2024-10-13 Refueling Outage; High System Voltage Action *
Calvert Cliffs 1 100 High System Voltage Action *
Calvert Cliffs 2 11 Increasing Power; High System Voltage Action *
FitzPatrick 96 Reduced Power For Rod Pattern Adjustment *
Ginna 0 2024-09-30 Refueling Outage *
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 2024-10-04 Refueling Outage
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 84 Coastdown To Refueling Outage *
Peach Bottom 3 100
Salem 1 100
Salem 2 0 2024-10-06 Refueling Outage
Seabrook 1 0 2024-10-05 Refueling Outage
Susquehanna 1 100 Minimum Generation Alert, 50 MVAR; High System Voltage Action *
Susquehanna 2 100 Minimum Generation Alert, 100 MVAR; High System Voltage Action *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 83 Increasing Power *
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 2024-10-01 Refueling Outage
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100 High System Voltage Action *
North Anna 2 100 High System Voltage Action *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2024-08-31 Refueling Outage.
Sequoyah 1 0 2024-09-30 Forced Outage, EN57351
Sequoyah 2 0 2024-07-31 Refueling Outage
Summer 0 2024-09-21 Refueling Outage
Surry 1 100
Surry 2 98 Coastdown To Refueling Outage *
Turkey Point 3 0 2024-10-13 Refueling Outage *
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 0 2024-10-13 Refueling Outage *
Vogtle 4 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 0 2024-10-07 Refueling Outage
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100 High System Voltage Action *
D.C. Cook 2 100 High System Voltage Action *
Davis-Besse 100 High System Voltage Action *
Dresden 2 100
Dresden 3 98 Coastdown To Refueling Outage
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 0 2024-10-12 Refueling Outage *
Prairie Island 1 0 2024-09-21 Refueling Outage
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2024-09-28 Refueling Outage
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 0 2024-09-29 Refueling Outage
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2024-10-05 Refueling Outage
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 0 2024-10-05 Refueling Outage
South Texas 2 100
Waterford 3 94 Transformer Limitation.
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.