Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Power Reactor Status Report for October 08, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 High System Voltage Action, Geomagnetic Disturbance Alert *
Beaver Valley 2 100 High System Voltage Action, Geomagnetic Disturbance Alert *
Calvert Cliffs 1 100 Geomagnetic Disturbance Alert *
Calvert Cliffs 2 100 Geomagnetic Disturbance Alert *
FitzPatrick 100
Ginna 0 2024-09-30 Refueling Outage
Hope Creek 1 100
Limerick 1 100 High System Voltage Action *
Limerick 2 100 High System Voltage Action *
Millstone 2 0 2024-10-04 Refueling Outage *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 87 Coastdown To Refueling Outage
Peach Bottom 3 100
Salem 1 100 *
Salem 2 0 2024-10-06 Refueling Outage
Seabrook 1 0 2024-10-05 Refueling Outage
Susquehanna 1 100 High System Voltage Action *
Susquehanna 2 100 High System Voltage Action *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2024-10-05 Maintenance Outage
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 2024-10-01 Refueling Outage
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2024-08-31 Refueling Outage
Sequoyah 1 0 2024-09-30 Forced Outage, EN57351
Sequoyah 2 0 2024-07-31 Refueling Outage
Summer 0 2024-09-21 Refueling Outage
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100 *
Vogtle 2 100
Vogtle 3 100
Vogtle 4 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100 Geomagnetic Disturbance Alert *
Braidwood 2 0 2024-10-07 Refueling Outage; Geomagnetic Disturbance Alert *
Byron 1 95 Holding Power for Fuel Conditioning *
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100 High System Voltage Action, Geomagnetic Disturbance Alert *
Dresden 2 100 Geomagnetic Disturbance Alert *
Dresden 3 100 Geomagnetic Disturbance Alert *
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100 Geomagnetic Disturbance Alert *
Perry 1 100
Point Beach 1 100
Point Beach 2 86 Coastdown To Refueling Outage
Prairie Island 1 0 2024-09-21 Refueling Outage
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2024-09-28 Refueling Outage
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 0 2024-09-29 Refueling Outage
Diablo Canyon 1 100 *
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2024-10-05 Refueling Outage
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 0 2024-10-05 Refueling Outage
South Texas 2 100
Waterford 3 94 Transformer Limitation.
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.