Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for September 30, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 0 2024-09-30 Refueling Outage *
Hope Creek 1 100
Limerick 1 100 *
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 90 Coastdown To Refueling Outage
Peach Bottom 3 100
Salem 1 100
Salem 2 95 Coastdown To Refueling Outage
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 75 Increasing Power *
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 34 Coastdown To Refueling Outage, EN57344 *
Catawba 2 34 Reduced Power For Maintenance *
Farley 1 100 Conservative ops for weather
Farley 2 100 Conservative ops for weather
Harris 1 100
Hatch 1 0 2024-09-27 EN 57343, Conservative ops for weather *
Hatch 2 80 Increasing Power, Conservative ops for weather *
McGuire 1 100 Conservative ops for weather *
McGuire 2 100 Conservative ops for weather *
North Anna 1 100
North Anna 2 100
Oconee 1 100 Conservative ops for weather
Oconee 2 100 Conservative ops for weather
Oconee 3 100 Conservative ops for weather
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2024-08-31 Refueling Outage
Sequoyah 1 0 2024-09-30 Forced Outage, EN57351 * 1
Sequoyah 2 0 2024-07-31 Refueling Outage
Summer 0 2024-09-21 Refueling Outage
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 0 2024-09-08 Refueling Outage
Vogtle 2 100 Conservative ops for weather
Vogtle 3 40 Holding Power for Grid Operations
Vogtle 4 100 *
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 97 Coastdown To Refueling Outage *
Byron 1 9 Increasing Power *
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 99 Coastdown To Refueling Outage
Fermi 2 100
LaSalle 1 100 *
LaSalle 2 100
Monticello 100
Perry 1 100 *
Point Beach 1 100
Point Beach 2 90 Coastdown To Refueling Outage
Prairie Island 1 0 2024-09-21 Refueling Outage
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2024-09-28 Refueling Outage
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 0 2024-09-29 Refueling Outage
Diablo Canyon 1 44 Reduced Power For Maintenance
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 94 Transformer Limitation. *
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.