Power Reactor Status Report for September 17, 2024
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in Report (*) | Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | Grid Warning: Geomagnetic Storm | * | ||
| Beaver Valley 2 | 100 | Grid Warning: Geomagnetic Storm | * | ||
| Calvert Cliffs 1 | 100 | Grid Warning: Geomagnetic Storm | * | ||
| Calvert Cliffs 2 | 100 | Grid Warning: Geomagnetic Storm | * | ||
| FitzPatrick | 0 | 2024-09-04 | Refueling Outage | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 91 | Reduced Power For Rod Pattern Adjustment; Turbine Valve Testing | * | ||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 25 | Post Startup. Increasing Power | * | ||
| Nine Mile Point 1 | 100 |