Skip to main content

Power Reactor Status Report for May 13, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 0 2024-04-13 Refueling Outage *
Beaver Valley 2 100 *
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100 *
FitzPatrick 100
Ginna 100
Hope Creek 1 7 Increasing Power *
Limerick 1 100 *
Limerick 2 100 *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 *
Susquehanna 1 100 *
Susquehanna 2 100 *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 90 Increasing Power *
Farley 2 100
Harris 1 28 Increasing Power *
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100 *
North Anna 2 100 *
Oconee 1 100
Oconee 2 100
Oconee 3 0 2024-05-04 Refueling Outage
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 0 2024-04-07 Refueling Outage *
Surry 2 100 *
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 99 Reduced Power For Secondary Flow Meter Maintenance
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100 *
Braidwood 2 100 *
Byron 1 100 *
Byron 2 100 *
Clinton 100
D.C. Cook 1 100 *
D.C. Cook 2 100 *
Davis-Besse 100 *
Dresden 2 100
Dresden 3 100
Fermi 2 55 Increasing Power Geomagnetic Disturbance Warning *
LaSalle 1 100 *
LaSalle 2 100 *
Monticello 100
Perry 1 0 2024-05-11 Maintenance Outage *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100 *
Prairie Island 2 42 Reduced Power For Maintenance *
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 0 2024-04-27 *
Arkansas Nuclear 2 100 *
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 0 2024-05-11 Maintenance Outage *
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 2024-04-07 Refueling Outage
Grand Gulf 1 41 Increasing Power *
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 12 Increasing Power *
River Bend Station 1 100
South Texas 1 100
South Texas 2 0 2024-05-13 Forced Outage; EN57124 * 1
Waterford 3 0 2024-03-21 Forced Outage *
Wolf Creek 1 93 Holding power for fuel conditioning *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.