Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for March 11, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 92 Coastdown To Refueling Outage
Limerick 1 95 Coastdown To Refueling Outage *
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 0 2024-03-03 Refueling Outage
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 One Down Power Contingency to 1100 Mwe
Susquehanna 1 93 Coastdown To Refueling Outage *
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 *
Browns Ferry 2 100
Browns Ferry 3 0 2024-02-17 Refueling Outage
Brunswick 1 0 2024-02-12 Refueling Outage
Brunswick 2 100
Catawba 1 100
Catawba 2 98 Coastdown To Refueling Outage *
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 20 Holding power for testing *
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 0 2024-03-03 Refueling Outage
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 2024-03-09 Refueling Outage
Saint Lucie 2 100
Sequoyah 1 93 Coastdown To Refueling Outage *
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 17 Holding power for testing *
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 99 Increasing Power *
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 0 2024-03-03 Refueling Outage
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 15 Secondary plant startup following turbine trip *
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 49 Holding power for chemistry
Quad Cities 1 100
Quad Cities 2 92 Coastdown To Refueling Outage

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 43 Reduced power due to recirculation pump trip *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 0 2024-03-02 Refueling Outage
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.