Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Power Reactor Status Report for January 23, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 *
Beaver Valley 2 100 *
Calvert Cliffs 1 95 Coastdown To Refueling Outage *
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100 *
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 98 Moisture Separator Reheater Issue;
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 Maintain a Minimum of 230 MVARs
Susquehanna 2 100 Maintain a Minimum of 230 MVARs

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 99 Coastdown To Refueling Outage *
Brunswick 1 100 *
Brunswick 2 100 *
Catawba 1 100 *
Catawba 2 100 *
Farley 1 100
Farley 2 100
Harris 1 100 *
Hatch 1 88 Coastdown To Refueling Outage
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100 *
Oconee 2 100 *
Oconee 3 100 *
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 99 Reduced Power For Rod Pattern Adjustment *
Vogtle 4 0 Correcting ADS Vibrations
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100 *
Braidwood 2 100 *
Byron 1 100 *
Byron 2 100 *
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100 *
Dresden 2 100 *
Dresden 3 100 *
Fermi 2 50 Increasing Power *
LaSalle 1 94 Coastdown To Refueling Outage *
LaSalle 2 100 *
Monticello 100
Perry 1 100 *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 0 2023-10-20 See EN 56803
Prairie Island 2 0 2023-10-07 Refueling Outage
Quad Cities 1 100 *
Quad Cities 2 80 Increasing Power, Returning From Maintenance *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 96 Stator Bar Temperature
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 0 2024-01-22 Forced Outage
South Texas 2 100
Waterford 3 0 2023-10-14 Refueling Outage
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.