Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for November 17, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 0 2022-10-09 Refueling Outage *
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100 *
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 Three down power contingencies due to ISO New England work *
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 Conservative Operations.
Browns Ferry 2 100 Conservative Operations.
Browns Ferry 3 100 Conservative Operations.
Brunswick 1 100
Brunswick 2 99 Coasting Down for Rod Pattern Adjustment *
Catawba 1 100
Catawba 2 100
Farley 1 0 2022-09-18 Refueling Outage
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 0 2022-10-29 Refueling Outage
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 76 Feedwater heater issue
Saint Lucie 2 100
Sequoyah 1 0 2022-10-22 Refueling Outage
Sequoyah 2 100 Conservative Operations.
Summer 100
Surry 1 0 2022-10-30 Refueling Outage
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 0
Watts Bar 1 100 Conservative Operations.
Watts Bar 2 100 Conservative Operations.

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 0 2022-10-31 Refueling Outage
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 0 2022-10-08 Refueling Outage
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 99 Reduced Power For Maintenance
Comanche Peak 2 99 Reduced Power For Maintenance
Cooper 86 Increasing power following startup. *
Diablo Canyon 1 100
Diablo Canyon 2 0 2022-10-15 Refueling Outage *
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 30 Increasing Power *
River Bend Station 1 94 Coastdown To Refueling Outage
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 0 2022-10-06 Refueling Outage *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.