Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for October 03, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 Coastdown To Refueling Outage
Beaver Valley 2 98 Unplanned Closure of Moisture Separator Steam Valve
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 0 2022-09-26 Refueling Outage
Ginna 100
Hope Creek 1 0 2022-09-28 Refueling Outage
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 89 Coastdown To Refueling Outage
Peach Bottom 3 100
Salem 1 100 *
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 17 Increasing Power; Sync to the Grid *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 2022-10-01 Refueling Outage *
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 98 Reduced Power For Transmission Maintenance *
Catawba 1 100
Catawba 2 0 2022-09-14 Refueling Outage
Farley 1 0 2022-09-18 Refueling Outage *
Farley 2 100
Harris 1 91 Coastdown To Refueling Outage *
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 0 2022-09-21 Refueling Outage
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 0 2022-09-25 Maintenance Outage *
Saint Lucie 1 0 2022-09-03 Refueling Outage *
Saint Lucie 2 100
Sequoyah 1 97 Coastdown To Refueling Outage *
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 0 2022-10-03 Refueling Outage *
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 0 2022-10-01 Refueling Outage
Davis-Besse 100
Dresden 2 100
Dresden 3 94 Coastdown To Refueling Outage
Fermi 2 100
LaSalle 1 100
LaSalle 2 82 Increasing Power *
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 90 Coastdown To Refueling Outage *
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 72 Coastdown To Refueling Outage *
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 0 2022-10-01 Refueling Outage *
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 96 Coastdown To Refueling Outage *
River Bend Station 1 100
South Texas 1 100
South Texas 2 93 Coastdown To Refueling Outage
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.